As part of the Graf Hall Renovation Project, the Monroe Ave. and 16th Street parking lot (lot #3221), located south of Graf Hall, will be closed for construction starting on Monday, August 30, 2021 through Tuesday, September 21, 2021. The accessible spaces at the east end of the lot adjacent to Merryfield Hall will remain open.

For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.

Lot #3221 closure area map

As part of the Arts and Education Complex project, half of the Kerr parking lot will be closed for waterline construction. Work is scheduled to start on Monday, August 23, 2021 through Monday, September 13, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Kerr parking lot area map

For work related to Pacific Power system upgrades, electrical trenching and vault placement will take place along SW Washington Way near the Magruder Hall Northeast Lot (parking lot #3360) in the evenings after business hours. Parking lot #3360 will be closed in the evenings to provide access for construction vehicles. Work is scheduled to start after 5 p.m. on the evenings of Wednesday, May 26 through Friday, May 28, 2021. This ongoing work supports Pacific Power’s power infrastructure and prepares for future upgrades to SW Washington Way.

For questions or comments on this work, contact Torre Oberg, project manager with Magnum Power, at 360-703-7432, or OSU Infrastructure Project Manager Aaron Collett at 541-207-2780. Magnum Power is the contractor working with Pacific Power.

Parking Lot #3360 area map

As part of the Campus Operations building project, the Western Building parking lot will be fully closed for paving. Paving work is scheduled to start on Thursday, April 15 through Sunday, April 18, 2021. If you are planning to come to the Western Building on these days, you will need to park in another parking lot. If you have fleet vehicles in the Western Building lot, they will need to be moved by end of day on Wednesday, April 14, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building parking lot area map

As part of the Campus Operations building project, partial closures are scheduled for the Western Building lot for grading and paving work. Partial lot closures are scheduled to start on Monday, April 5 through Friday, April 23, 2021. Half of the parking lot will remain open at all times. Please note, paving work is weather dependent and future updates to the schedule may follow this notice.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building lot area map

As part of the Motor Pool Canopy Construction Project, a new canopy is being built at the fuel island north of the Motor Pool Building. Fencing will go up around the area, and work will start on Tuesday, March 2, 2021 and continue through Monday, March 29, 2021. Staging will occur in the parking lot west of the Motor Pool Building.

For questions or comments on this closure, contact OSU Infrastructure Project Manager Aaron Collett at 541-207-2780.

Motor Pool area map

As part of the Campus Operations building project, partial closures are scheduled for the Western Building parking lot. The partial lot closures are scheduled to start on Monday, Feb. 8 through Friday, Feb. 12, 2021. The west half of the parking lot will be closed for storm line work from Monday, Feb. 8 through Wednesday, Feb. 10, 2021. The east half of the parking lot will be closed for storm line work from Thursday, Feb. 11 through Friday, Feb. 12, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building parking lot area map

Road closures are scheduled around West Campus residence halls to support work related to the Buxton, Hawley and West roof replacement projects. Work is scheduled to take place from 8 a.m. to 5 p.m., on Friday, Dec. 18, 2020. Work will start at 8 a.m. at SW Intramural Lane south of West Hall. Once complete, work will transition to the west end of Hawley Hall and obstruct SW Sackett Place and the east sidewalk. Then, work will shift to the north of Hawley Hall and Buxton Hall, and one lane of SW Jefferson Way will be closed along with the south sidewalk. Next, work will shift to SW Weatherford Place and will close the road as well as the west sidewalk. Each portion of work is anticipated to take approximately two hours to stage and pick the supplies to the roofs of the buildings. Intramural parking lot #3294 will also be impacted while work takes place.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

Roof work area map
Roo

A closure is scheduled for parking lot #3278 (Sports Complex East) to set and install new light poles. Work for parking lot #3278 (Sports Complex East) is scheduled to start on Monday, Sept. 28 to Tuesday, Sept. 29, 2020. The lot will be fully or partially closed for construction and planned closure durations are subject to change.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or Transportation Services Parking Manager Mark Zandonella at 541-737-8205.

Sports Complex East lot

As part of the Gilbert Hall Chiller Replacement Project, parking lot #3222 (Weniger Hall East Lot) will be closed for standing a crane pick for the placement of a rooftop chiller on Gilbert Hall. The lot closure is scheduled for Saturday, Aug. 1, 2020 from 7 a.m. to 12 p.m.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

Parking lot #3222 (Weniger Hall East Lot)
Parking lot #3222 (Weniger Hall East Lot)