As part of the Kerr South Parking Lot project, there will be a lane closure on SW 15th Street, just south of the Kerr Administration Building, on Monday, January 8 from 9 A.M. to 3 P.M. Flaggers will be present to direct traffic through the area. Other possible impacts include noise near the work site.

The map shows the location of a lane closure on SW 15th St. near the Kerr Administration Building.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the LaSells Stewart Center Mechanical & Roof Renewal project, the northbound lane of SW 26th St. will be closed on Monday, December 18 to allow for crane activity. The closure will extend from SW Western Blvd to SW Washington Way. Flaggers will be present in the area to direct southbound traffic on 26th St.

A section of the east sidewalk on 26th St. will be closed from Western Blvd. to CH2M Hill Alumni Center. Pedestrians may use the west sidewalk as a detour.

PLEASE NOTE: this notification is one of four road closures or construction zones will be impacting travel on 26th St. between Western Blvd. and Orchard Ave. during the period of December 18 – January 5. See locations and dates below:

The map shows a lane and sidewalk closure on SW 26th Street between SW Western Blvd. and SW Washington Way. The east sidewalk on 26th Street will be closed between Western Blvd. and CH2M Hill Alumni Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the LaSells Stewart Center Mechanical and Roof Renewal project, a section of the northbound lane on SW 26th St. will be closed on Thursday, November 30th from 7 A.M. to 5 P.M. to allow for crane activity. The lane closure will be located between the intersection with SW Western Blvd. and The LaSells Stewart Center.

In addition, the traffic signals at the intersection of 26th St. and Western Blvd. will be shut down during this closure. Flaggers will be present at the intersection to direct traffic through the area.

The east sidewalk on 26th St. will be closed between Western Blvd. and the CH2M Alumni Center. The west sidewalk will remain open for pedestrians. The walkway on the north side of The LaSells Stewart Center will also be closed. Other possible impacts include noise near the work site.

The map shows a lane and sidewalk closure on SW 26th St. The northbound lane between SW Western Blvd. and The LaSells Stewart Center is marked as closed. The east sidewalk on 26th St., between Western Blvd. and the CH2M Alumni Center, is marked as closed. The walkway north of the LaSells Stewart Center is marked as closed. The map indicates flaggers at the intersection of 26th St. and Western Blvd. and throughout the closed area to direct traffic.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kerr South Parking Lot project, there will be intermittent delays on SW 15th St. due to construction activities on Thursday, November 16 and Friday, November 17. A single lane will be closed at a time, with traffic being allowed to pass through the opposite lane. Flaggers will be present to direct traffic. The impacted area will be between SW Washington Ave. and SW Adams Ave. near the Kerr Administration Building and Callahan Hall. Drivers should expect delays between 9 A.M. and 3 P.M. on both days.

A section of the sidewalk on the west side of 15th St., just north of the work area, is closed under a previous notification along with the crosswalk at SW Adams Ave. The east sidewalk will remain open for pedestrians. Other possible impacts include noise near the work site.

The map shows an aerial view of SW 15th St. near the Kerr Administration Building. A red highlighted section indicates intermittent delays for vehicles in the area.

For questions or comments on this closure, contact Construction Manager Derek Bennett (541) 609-6111.

As part of the Kerr South Parking Lot project, there will be intermittent delays on SW 15th St. due to construction activities on Thursday, November 9 and Friday, November 10. A single lane will be closed at a time, with traffic being allowed to pass through the opposite lane. Flaggers will be present to direct traffic.

The impacted area will be between SW Washington Ave. and SW Adams Ave. near the Kerr Administration Building and Callahan Hall. Drivers should expect delays between 9 A.M. and 3 P.M. on both days.

The west sidewalk will be closed along with the crosswalk at SW Adams Ave. The east sidewalk will remain open for pedestrians. Other possible impacts include noise near the work site.

The map shows an aerial view of SW 15th St. near the Kerr Administration Building. A red highlighted section indicates intermittent delays for vehicles in the area.

For questions or comments on this closure, contact Construction Manager Derek Bennett (541) 609-6111.

As part of the Washington Way Improvement project, intersection work will occur along SW Washington Way at SW 17th, SW 26th and SW 30th Streets starting Monday, October 16 through Friday, October 20th. Please see the schedule below for details.

10/16 – 10/17: The intersection at 17th St. will be closed to vehicle traffic. Crosswalks and sidewalks will remain open for pedestrians.

10/17 & 10/19: Work will occur at the 26th St. intersection, but the intersection will remain open for vehicles and pedestrians. Flaggers will be present to direct traffic.

10/19 – 10/20: Work will occur at the 30th St. intersection, but the intersection will remain open for vehicles and pedestrians. Flaggers will be present to direct traffic.

The map shows the intersection at SW 17th St. and SW Washington Way. The intersection is marked as closed to vehicle traffic, but open for pedestrians.
The top map shows the intersection at SW Washington Way and SW 26th St. The bottom map shows the intersection at SW Washington Way and SW 30th St. Both intersections are marked as flagged areas, open to both vehicle and pedestrian traffic.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.