As part of the Nash Hall Elevator project, work is scheduled to modify four sprinkler heads. This requires a temporary shutdown of the water to the fire suppression system as well as temporary disabling of associated alarms. Work is scheduled to take place on the morning of Monday, April 26, 2021. This work does not impact other building utilities.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map

The building air handler units 1 & 3 will be shut down one at a time to change the belts in Ag. Life & Sciences April 20, 2021 7:00 am – 10:00 am. Building occupants may notice slight pressure & air flow changes throughout the building.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

For work related to Pacific Power system upgrades, Pacific Power will perform trenching work along 35th Street through Friday, April 16, 2021. Trenching work will occur in the following areas: near the Energy Center in the Energy Center East Lot (lot #3340), the Energy Center South Lot (lot #3339) and the 35th Street access to the Energy Center. The access along SW Jefferson Way will remain open. This work supports Pacific Power’s power infrastructure and prepares for future upgrades to SW Washington Way.

For questions or comments on this closure, contact Torre Oberg, the project manager with Magnum Power, at 360-703-7432, or OSU Infrastructure Project Manager Aaron Collett at 541-207-2780. Magnum Power is the contractor working with Pacific Power.

35th Street trenching work area map

As part of the Milam Hall re-roofing project, a lift will be set up adjacent to Milam Hall for the roof design team to gain access to the roof starting at 9 a.m. on Thursday, April 15, 2021. Work will continue through Friday, April 16, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780.

Milam Hall area map

As part of the Campus Operations building project, the Western Building parking lot will be fully closed for paving. Paving work is scheduled to start on Thursday, April 15 through Sunday, April 18, 2021. If you are planning to come to the Western Building on these days, you will need to park in another parking lot. If you have fleet vehicles in the Western Building lot, they will need to be moved by end of day on Wednesday, April 14, 2021.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building parking lot area map

The building air supply fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences April 14, 2021 9:00 am – 1:00 pm. Building occupants may notice slight pressure & air flow changes throughout the building.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

As part of the Nash Hall Elevator project, a crane pick of elevator equipment is scheduled at Nash Hall, and in the building’s loading dock area and around the access road south of building. The Sackett North Lot (lot #3303) areas around Nash Hall will be impacted. Work is scheduled for Thursday, April 8, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall crane work area map

As part of the Campus Operations building project, partial closures are scheduled for the Western Building lot for grading and paving work. Partial lot closures are scheduled to start on Monday, April 5 through Friday, April 23, 2021. Half of the parking lot will remain open at all times. Please note, paving work is weather dependent and future updates to the schedule may follow this notice.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Western Building lot area map

Geotechnical drilling and boring work is scheduled to occur at five locations in the West Greenhouse area. Work will take place near a section of Campus Way, the West Greenhouse parking lot (lot #3320), and on the west and east sides of the Seed Lab from 7 a.m. to 5 p.m., on Wednesday, March 31, 2021.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

West Greenhouse area map with boring holes outlined in red

As part of the North District Utility Plant (NDUP) project, work to provide electrical service to the NDUP, located along NW Orchard Avenue, is scheduled to start on Monday, March 29, 2021 through Friday, April 16, 2021. Work could create possible extended construction activity and noise, and/or noise during normal business hours. A roadway closure for SW 26th Street between Campus Way and Monroe Avenue and a partial parking lot closure for the Bates Hall lot (lot #3313) are also scheduled as part of the work.

For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.

North District Utility Plant work site map