As part of early work for the Jen-Hsun & Lori Huang Collaborative Innovation Complex project, sidewalks on the north, south and east sides of Johnson Hall will be closed to pedestrians from Monday, December 18 through January 5, 2024.

Sidewalks closed on the south, north and east side of Johnson Hall from December 18 until January 5.

For questions or comments on this closure, contact Construction Manager  Jason Lundy at (541) 270-0193.

As part of the Jen-Hsun & Lori Huang Collaborative Innovation Complex project, a section of the west sidewalk along SW Park Terrace Place will be permanently closed to allow for ongoing construction activities. The closure will begin Thursday, November 30. The impacted sidewalk section is located just north of Johnson Hall. This will be a permanent closure as the area undergoes construction related to the Huang Collaborative Innovation Complex.

The east sidewalk will be open for pedestrians. Other possible impacts include noise, dust and mud near the work site.

The map shows a sidewalk closure on the west side of SW Park Terrace Place, just north of Johnson Hall. The east sidewalk is marked as open.

For questions or comments on this closure, contact Project Manager Dustin Sievers at (541) 760-6240.

As part of the Kelley District Utility Plant project, the steam system will be shut down in Johnson Hall on Friday, November 17 and Saturday, November 18 to allow for steam piping repairs in the mechanical room. This shutdown will impact the entire building. The building will experience temperature fluctuations and hot water will be unavailable during the shutdown. The building will be monitored while the steam system is offline for any potential issues.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley Engineering District Utility Plant project, the air conditioning system will be shut down in Kelley Engineering Center and Johnson Hall from Friday, August 11 through Wednesday, August 30.

For questions or comments on this project, contact Project Manager Ryan Wilson at (503) 779-3488.  

As part of the Kelly District Utility Plant project, a section of SW 26th St. will be closed at the intersection with NW Orchard Ave. to allow for crane activity on Tuesday, July 18, from 6:30 – 10:00 A.M. The east sidewalk along 26th St. will be closed between the Park Terrace St. West parking lot entrance and Johnson Hall. The walkway along the north side of Johnson Hall will also be closed.

The intersection at 26th St. and Orchard Avenue will be closed to vehicle traffic, but the crosswalk and the west sidewalk along 26th St. will remain open for pedestrians. Drivers should expect to see flaggers in the area.

The 26th St. entrance to the Park Terrace St. West lot (A2) near the Ocean Administration Building will be closed, but the parking lot will remain accessible from SW Park Terrace Place.

Other possible impacts include noise near the work site.

The map shows a road closure on SW 26th St., at the intersection with NW Orchard Ave., near Johnson Hall. The east sidewalk along 26th St. is closed between the Park Terrace St. West parking lot and Johnson Hall.

For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.  

As part of the Kelley District Utility Plant project, the chilled water cooling system will be temporarily shut down in Kelley Engineering Center and Johnson Hall on Thursday, July 6 from 5 A.M. to 1 P.M to allow for piping work. The chilled water system controls the air conditioning in the impacted buildings.

The buildings will experience higher than normal temperatures, but the server rooms will not be impacted by this shutdown. ADA access will be maintained during this project.

Other possible impacts include noise and dust near the work site.

For questions or comments on this closure, contact Construction Manager Justin Fuszek (541) 740-5260.

The exhaust and supply air in Johnson Hall will be shut down for maintenance March 30, 8:00 am – 4:00 pm.  All fume hood exhaust will be shutdown, sashes should be kept closed. This will also affect heating/cooling of the lab spaces on the north side 2nd and  3rd floors of the building.

For questions or comments on this closure contact Facilities Services 541-737-2969.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

Week of July 4th

  • Reser Stadium
  • Merritt Truax Indoor Center
  • Magruder Hall Onan
  • Magruder Hall Generac

Week of July 11th

  • Cascade Hall
  • Dryden Hall
  • Lab Animal Resources Center
  • George W. Peavy Forest Science Center
  • Richardson Hall

Week of July 18th

  • Energy Center
  • Precision Agricultural Systems Center
  • RAIL

Saturday July 23rd

  • Nash Hall & Linus Pauling Science Center
  • Agricultural & Life Sciences Building

Week of July 25th

  • Hallie E. Ford Center
  • Kelly Engineering Center
  • Johnson Hall
  • Plageman Student Health Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures.

Please forward this notice to anyone who would benefit from this information.

_____________________________

Facilities Services

University Facilities, Infrastructure & Operations

Oregon State University

830 SW 35th Street | Corvallis, OR 97331 | 541-737-2969