Power will be shut down by Pacific Power in Gilbert Hall, Graf Hall and the Dearborn Motor Lab March 27, 2025, from 5:00 pm through March 28 at 5:00 am for the installation of new power poles and service along Monroe Avenue in support of the HCIC project. This will affect power building wide in Gilbert and Graf Halls and the Motor Lab area only in Dearborn. Gilbert and Graf will remain closed for the duration of the outage. Please remind building occupants to close fume hood sashes before leaving on Thursday, March 27th.

For questions or comments on this notice contact, Brandon Holden at 541-737-8313.

What do you need to do to prepare for this outage?

Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to March 27th at 5pm. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. Please ensure that all fume hoods are closed before leaving the labs.

The air handler in Gilbert Hall will be shut down for maintenances March 22, 7:00 am – April 2, 2024 5:00 pm for replacement of coils and sealing the floor and pipes in air handler to prevent leaks. This will affect heat and cooling and building wide and cause reduced airflow and to labs during this time.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

On Wednesday, March 27th, 2024 from 7:00 am – 5:00 pm, the parking lot east of Weniger (view map) will be partially closed to accommodate the crane for maintenance work on Gilbert Hall roof.

For questions or comments on this closure, contact Facilities Services at 541-737-2969.

The Gilbert Hall elevator will be out of service effective Wednesday, September 27. Due to the need for repair and specialized parts, this is expected to be an extended service outage. A temporary, ADA-accessible ramp will be constructed on the east side of the building which will allow access to the first floor classroom. The ramp is currently under construction and is expected to be complete by Monday, October 2.

ADA access to the Gilbert Hall basement will remain available from the NW Monroe Avenue entrance. Access to the second and third floors will be available via the Gilbert Hall Addition across the bridge into Gilbert Hall.

The map shows an aerial view of Gilbert Hall with a temporary ramp location marked on the east side. The access bridge from the Gilbert Hall Addition is also marked.

For questions or comments on this closure, contact Construction Manager Eric Smith at (541) 409-5037.