As part of the Washington Way Improvement project, the steam system will be shut down in Gill Coliseum through Tuesday, June 27.
For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.
As part of the Washington Way Improvement project, the steam system will be shut down in Gill Coliseum through Tuesday, June 27.
For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.
As part of the Jen-Hsun & Lori Huang Collaborative Innovation Complex project, soil sampling work will occur around and near the Lonnie B. Harris Black Cultural Center from Monday, June 26 through Wednesday, June 28. Multiple parking spaces on the north end of the A2 parking lot west of the building will be closed. The rest of the parking lot will remain open. The work will require periodic closures to the Center’s patio area. The sidewalks bordering NW Monroe Avenue to the north and SW Memorial Place to the east will not be impacted. The sidewalks on the west and south sides of the Center may be temporarily unavailable due to equipment needs. Other possible impacts include noise near the work site.
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Kerr Administration South Parking Lot Improvement project, the Kerr South parking lot will be closed for construction activities from Monday, June 26 through Wednesday, September 27. The path running along the west side of the Kerr Administration Building will be closed along with the south entrance/exit to the parking lot and the ADA ramp. Other possible impacts include noise, dust and mud near the construction site.
For questions or comments on this closure, contact Project Manager Christina Vinson at (503) 420-1031.
As part of the Pride Center Renovation project, the north sidewalk on SW A Avenue between SW 15th and SW 16th Streets will be closed on Friday, June 23 from 7 A.M. to 5 P.M. The impacted sidewalk section is located directly in front of the Pride Center. Pedestrians may detour across A Avenue at either the 15th Street crosswalk or at the intersection of 16th Street and A Avenue and use the south sidewalk.
Other possible impacts include noise, dust and mud near the construction site.
For questions or comments on this closure, contact Construction Manager Scylise Little.
Effective Date(s): Wednesday, June 21 – Monday, July 3
This is an update to a previous notification for a closure on SW 26th Street near Dixon Recreation Center. The road and west sidewalk closure will remain in place. The new pedestrian detour will be along the sidewalk that runs between the Coliseum Substation and the sand volleyball courts, just south of Dixon Recreation Center. Signs will be placed at the sidewalk endpoints on 26th Street and Washington Way to direct pedestrian traffic. The closures and pedestrian detour will remain in effect through July 3.
For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.
As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 26 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
As part of the West Greenhouse Improvement Project, a section of the westbound lane and the north sidewalk on SW Campus Way will be closed between the greenhouses and the Seed Laboratory on Thursday, June 22 from 10 A.M. to 2 P.M. The impacted section is located in front of the West Greenhouse Complex parking lot entrance. Drivers should expect to see flaggers in the area. Pedestrians may detour around the closure using the crosswalks located at SW 30th Street. and the Seed Laboratory.
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Bloss Hall Remodel project, SW Stadium Ave. just south of Bloss Hall will be closed on Monday, June 19 from 8 A.M. to 4 P.M. for crane activity. The Bloss Hall South and Bloss Hall West parking lots will remain open during this closure. Other impacts may include noise.
For questions or comments on this closure, contact Patrick Robinson.
As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 19 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
As part of the Washington Way Improvement project, the steam system will be shut down in Gill Coliseum from Monday, June 19 to Friday, June 23.
For questions or comments on this closure, contact Construction Manager Aaron Amoth at (541) 207-5084.