This is an update to a previous notification.
The existing street and sidewalk closure on SW Memorial Place has been extended through 4/22/25.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
This is an update to a previous notification.
The existing street and sidewalk closure on SW Memorial Place has been extended through 4/22/25.
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
This notification involves a road closure and a detour for vehicles. Please read carefully.
As part of the Washington Way Improvement project, SW Washington Way will be closed between SW 26th and SW 30th St. starting on Wednesday, March 19 through Wednesday, April 9.
The southbound lane of SW 26th St. will also be closed between SW Jefferson Way and SW Washington Way. No southbound traffic will be permitted through the area. The northbound lane will remain open. Southbound vehicles will detour down Jefferson Way. Signs will be in place to direct traffic.
The west sidewalk on SW 26th St. will be closed between SW Jefferson Way and SW Washington Way. The east sidewalk will remain open for pedestrians.
Other possible impacts include noise, dust and mud near the work area.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
Due to construction and roofing work happening at Dixon Recreation Center, the ADA accessible path that runs along the north and east sides of Dixon will be closed starting on Monday, March 24 through Friday, October 10.
The east entrance to Dixon Rec Center will be closed.
Bike parking on the east side of Dixon will be closed for the duration of this project. All bikes must be removed from the bike racks before Monday, March 24. Any remaining bikes will be removed by the OSU Department of Public Safety.
For questions or comments on this closure, contact Construction Manager Eric Smith at (541) 409-5037.
Due to the pruning of trees, south bound 30th Street between North Orchard and Campus Way (see map) will be closed Tuesday March 25, 2025 from 7:00 am to 4:20 pm.
For questions or comments on this closure, contact Chris Trine at 541-737-3488.
Due to the pruning of trees, Campus Way between north and south bound 30th Street (see map) will be closed Tuesday March 25, 2025 from 7:00 am to 12:00 pm.
For questions or comments on this closure, contact Chris Trine at 541-737-3488.
Important – please read carefully for information regarding construction impacts over the next several months.
The city of Corvallis will be conducting a long-term construction project to replace a water pipeline on SW 35th St. and SW Western Blvd. Work is slated to begin at the end of March and is expected to continue over the summer.
The city plans to begin work on SW Western Blvd. and then move to SW 35th St. later this spring. Along with the new water pipeline, the city will be improving pedestrian crossings, adding buffered bike lanes in some sections of roadway and repaving both streets.
The Corvallis Public Works Department stated that detours for vehicles would be in place for road closures and any disruptions in water service would be communicated to affected buildings 48 hours in advance. Local access to residences, businesses and other buildings will be maintained during this project.
Once the city’s construction schedule is finalized, notifications regarding campus road closures and other impacts will be available on the Campus Notifications blog, where subscribers can receive updates via email.
Beaver Bus riders can find updates on detours and route changes by visiting the Beaver Bus Route Changes or the Beaver Bus Tracker pages.
The water and restrooms in Furman Hall will be shut down and closed in the entire building for emergency sewer repairs. This affects all toilets, sinks, drinking fountains and hot water heaters. Portable toilets will be available on the west side of Furman Hall. A second notice will follow when services have been restored.
EH&S has asked us to remind building occupants thatwater will not be available to emergency eyewash/shower units, and occupants should discontinue all hazardous substance use (chemicals, unsealed radioisotopes, and biohazardous materials) for the duration of the shutdown
For questions or comments on this notice contact, Andy Gray at 541-737-7651.
Note: this closure involves multiple impacts. Please read carefully.
Due to construction and roofing work happening at Dixon Recreation Center, the ADA accessible path that runs along the north and east sides of Dixon will be closed starting on Monday, March 24. This will be a long-term closure which is scheduled to end on Friday, October 10.
Bike parking on the east side of Dixon will be closed for the duration of this project. All bikes must be removed from the bike racks before Monday, March 24. Any remaining bikes will be removed by the Department of Public Safety.
The east entrance to Dixon Rec Center will be closed.
For questions or comments on this closure, contact Construction Manager Eric Smith at (541) 409-5037.
As part of renovation work at Fairbanks Hall, a section of the walkway on the west side of the building will be closed on Thursday, March 6. The ADA ramp and entrances on the west side of the building will remain open.
For questions or comments on this closure, contact Construction Manager Scylise Little.