Two sections of SW Jefferson Way will be fully closed in both directions to allow for speed bump work. Sidewalks will remain open for pedestrians. Please see below for schedule and locations.

Friday, 8/16: Jefferson Way closed between 30th and 35th St.

Monday, 8/19: Jefferson Way closed between 26th and 30th St.

Other possible impacts include noise, dust and mud near the work areas.

Two maps showing road closures on SW Jefferson Way between 30th - 35th St. and 26th - 30th St.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Washington Way Improvement project, flaggers will be present to direct traffic at the intersection of SW 35th St. and SW Washington Way starting Friday, August 9 and continuing intermittently through Friday, August 16. Minor traffic delays should be expected.

The east-west crosswalk on the north side of the intersection will be closed.

Other possible impacts include noise, dust and mud near the work site.

A map showing a construction zone at the intersection of SW 35th St. and SW Washington Way.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex project, traffic will be restricted to a single lane on NW Monroe Ave. at NW 25th St. to allow for intersection work. This closure will be in effect starting Monday, August 12 through Friday, August 23, from 8:30 A.M to 4:30 P.M. each day.

The north-south crosswalk at Monroe Ave. and 25th St. will be closed. Several city parking spaces to the east and west of the intersection, on the north side of Monroe Ave., will be closed.

Flaggers will be present at the intersection to direct traffic through the area. Other possible impacts include noise near the work site.

A map showing a closure of one lane of traffic on NW Monroe Ave. at the intersection with NW 25th St. The north-south crosswalk at the intersection of Monroe Ave. and 25th St. is marked as closed. Parking spaces to the east and west of the intersection on the north side of Monroe Ave. are marked as closed.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.  

As part of the Washington Way Improvement project, the multi-use path on SW Washington Way between SW 30th and SW 35th St. will be closed from Monday, August 12 – Friday, September 13. A temporary pedestrian detour will be available along the new pedestrian path located on the north side of Washington Way.

Washington Way between SW 30th and SW 35th St. will remain closed to vehicle traffic.

Other possible impacts include noise, dust and mud near the work site.

A map showing a closure of the multi-use path on the south side of SW Washington Way between SW 30th and SW 35th Streets.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Washington Way Improvement project, the multi-use path on the south side of SW Washington Way, between SW 15th and SW 17th St., will be closed starting Monday, August 5 through Friday, August 9.

Other possible impacts include noise, dust and mud near the work site.

A map showing a closure on the SW Washington Way multi-use path between SW 15th and SW 17th St.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.