As part of the Kerr South Parking Lot project, the south entrance of the Kerr Administration Building will be closed along with the south sidewalk, the ADA ramp and the west walkway. This closure will be in effect through August 31.

ADA access will be maintained via the east entrance between the Kerr A and B buildings.

The sidewalk east of the building along SW 15th St. will also remain closed (see previous notification). Other possible impacts include noise, dust and mud near the work site.

The map shows a closure along the west and south walkways at the Kerr Admin Building. The ADA ramp and the south entrance to the building are marked as closed. The sidewalk east of the building along SW 15th St. is also marked as closed. An ADA access route is marked on the north side of the building, leading to the east entrance.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609 – 6111.

Print Friendly, PDF & Email

Discover more from OSU Corvallis Campus Closures, Shutdowns and Detours

Subscribe to get the latest posts sent to your email.

Comments are closed.