As part of the Pride Center Renovation project, the north sidewalk on SW A Avenue between SW 15th and SW 16th Streets will be closed on Friday, June 23 from 7 A.M. to 5 P.M. The impacted sidewalk section is located directly in front of the Pride Center. Pedestrians may detour across A Avenue at either the 15th Street crosswalk or at the intersection of 16th Street and A Avenue and use the south sidewalk.
Other possible impacts include noise, dust and mud near the construction site.
![The map shows a sidewalk closure on the north side of SW A Avenue between SW 15th and SW 16th Streets. There is a pedestrian detour marked at the intersections of SW 15th and SW 16th Streets and running along the south sidewalk of SW A Avenue.](https://i0.wp.com/osu-wams-blogs-uploads.s3.amazonaws.com/blogs.dir/1905/files/2023/06/6.23-Avenue-A-Sidewalk-Closure.jpg?resize=770%2C518&ssl=1)
For questions or comments on this closure, contact Construction Manager Scylise Little.