As part of the Community Hall Slope project, the walkway located on the south side of the Pharmacy Building will be closed from 2/8 -2/10/23 for handrail installation. The ADA parking spots in the south Pharmacy/Furman parking lot will also be closed during this time. ADA access to buildings in the area will be maintained. Minor noise impacts are also possible.
![A map showing the walkway south of the Pharmacy Building with a highlighted section indicating the work area.](https://i0.wp.com/osu-wams-blogs-uploads.s3.amazonaws.com/blogs.dir/1905/files/2023/02/Comm-Hall-Slopes-PCC-Map020723.jpg?resize=770%2C595&ssl=1)
For questions or comments on this closure, contact Construction Manager Scott Bond at (541) 974-2520.