For work related to Pacific Power system upgrades, electrical trenching and vault placement will take place along SW Washington Way near the Magruder Hall Northeast Lot (parking lot #3360) in the evenings after business hours. Parking lot #3360 will be closed in the evenings to provide access for construction vehicles. Work is scheduled to start after 5 p.m. on the evenings of Wednesday, May 26 through Friday, May 28, 2021. This ongoing work supports Pacific Power’s power infrastructure and prepares for future upgrades to SW Washington Way.

For questions or comments on this work, contact Torre Oberg, project manager with Magnum Power, at 360-703-7432, or OSU Infrastructure Project Manager Aaron Collett at 541-207-2780. Magnum Power is the contractor working with Pacific Power.

Parking Lot #3360 area map
Print Friendly, PDF & Email

Discover more from OSU Corvallis Campus Closures, Shutdowns and Detours

Subscribe to get the latest posts sent to your email.

Comments are closed.