As part of the Merryfield Hall Renovation Project, a planned water shutdown is scheduled for Merryfield Hall so new fixtures can be connected. The water shutdown is scheduled for Monday, July 27, 2020 from 6:30 a.m. to 4 p.m.
For questions or comments on this closure, contact Construction Manager Dave Raleigh at 541-230-0804.
![Merryfield Hall area map](https://i0.wp.com/osu-wams-blogs-uploads.s3.amazonaws.com/blogs.dir/1905/files/2020/07/Merryfield-Kearney-Halls-map.png?resize=726%2C540&ssl=1)