Due to the tree maintenance, Southbound lane of 30th Street between Jefferson Street and Washington Way (see map) will be closed February 21 & 22, 2024 from 7:00 am to 4:30 pm.
For questions or comments on this closure, contact Todd Cross at 541-737-6741.
Due to the tree maintenance, northbound lane of 30th Street between Jefferson Street and Washington Way (see map) will be closed February 19 & 20, 2024 from 7:00 am to 4:30 pm.
For questions or comments on this closure, contact Todd Cross at 541-737-6741.
A truck will be filling a trench with aggregate material on the east side of Cordley Hall starting Thursday, February 15 through Monday, February 19. This may result in noise impacts for building occupants and the surrounding area.
For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.
As part of the Kelley Engineering Center Second Floor Remodel, there will be a building-wide domestic water shutdown at Kelley Engineering Center on Saturday, February 17 from 6 A.M. to 6 P.M. This shutdown will affect bathrooms, kitchens and drinking fountains throughout the building.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
As part of the ALS Building Controls and Equipment Replacement project, the Agricultural and Life Sciences Building will be closed on Wednesday, February 14 from 5 A.M. to 7 A.M. The air handlers and exhaust system will be shut down building-wide during the closure. No entry will be permitted. Reasonable indoor temperatures will be maintained during the closure.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
The pool at Langton Hall will be shut down for maintenance and repairs until further notice. A second notice will follow when services have been restored.
For questions or comments on this closure contact Facilities Services at 541-737-2969.
As part of the Washington Way Improvement project, the multi-use path on the south side of SW Washington Way will be closed between SW 30th and SW 35th St. on Monday, February 12 to allow for construction work near the 30th St intersection.
Other possible impacts include noise, dust and mud near the worksite.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
As part of the Beth Ray Solar project, SW Stadium Ave. will be closed on the south side of the Beth Ray Center on Friday, February 9 from 6:00 – 7:30 A.M. to allow for crane activity. The road closure will be located between the Beth Ray Center and CH2M HILL Alumni Center.
The sidewalks on both sides of Stadium Ave. will also be closed along with two reserved parking spots, the loading dock and the dumpster access area on the south side of the street.
For questions or comments on this closure, contact Construction Manager Liz Roach at (701) 371-2938.
The building air fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences February 14, 2024 6:00 am – 12:00 pm. Building occupants may notice slight pressure & air flow changes throughout the building.
For questions or comments on this closure contact Facilities Services at 541-737-2969.
As part of the Withycombe Hall Renovation project, a vacuum truck will be working on SW Campus Way between Linus Pauling Science Center and Withycombe Hall. This may result in noise impacts for building occupants in the surrounding area on Monday, February 5 from 7 A.M. to 4 P.M.
For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.