As part of the Corvallis Campus Housing and Dining Vision project, three B2 parking lots located between Bloss Hall, the LaSells Stewart Center and the CH2M Hill Alumni Center will be permanently closed starting on Monday, July 14. The closure area includes the roadway and sidewalks on SW Stadium Ave. between SW Western Blvd. and Bloss Hall.

This closure is needed to accommodate construction of a new residence hall. Please see the project webpage for details. Construction will continue on this project through summer 2027. SW Stadium Ave. will be reopened to allow access to the OSU parking garage from SW Western Blvd. for game days and other preplanned events.

The following parking lots will be closed:

  • 3259 – LaSells Stewart Center East Lot
  • 3270 – Bloss Hall South Lot
  • 3273 – Bloss Hall West Lot
A map showing the planned location of a residence hall.

For questions or comments on this closure, contact Project Managers John Doty, (541) 737-5302 or Dale Bettencourt, (541) 207-7860.

As part of the UHDS Vision Phase 1 project, several parking lots along SW Stadium Ave. will be impacted by intermittent parking space and drive lane closures starting Friday, Jan. 31 through Wednesday, Feb. 12.

The impacted lots will remain open, but various parking spaces and drive lanes may be temporarily closed during this time frame.

Impacted parking lots

  • 3259 – LaSells Stewart Center East Lot (B2)
  • 3270 – Bloss Hall South Lot (B2)
  • 3273 – Bloss Hall West Lot (B2)
  • 3280 – May Way Lot (R)
A map showing closures in several parking lots along SW Stadium Ave.

For questions or comments on this closure, contact Construction Manager Tarrigon Van Denburg at (714) 390-5313.