Student Legacy Park east and west fields will be closed starting Monday, September 9 through Tuesday, September 10 for resurfacing and line painting. The Student Legacy Park South parking lot will also be closed.
9/9: east field closed 9/9 – 9/10: west field closed
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Student Legacy Park Resurfacing project, construction activity may create minor delays for pedestrians along the sidewalk west of Dixon Recreation Center. The work will take place on Friday, December 8 from 12 – 4 P.M. Several parking spaces on the east side of SW 26th St. will be taped off for equipment staging. Work crews will be moving between the fenced construction area around the sand volleyball courts and a cement mixer parked on 26th St. Impacts to pedestrians are expected to be minimal.
In addition, a second work site will be active along the south sidewalk on SW Intramural Lane, across from Poling Hall. Workers in the area will be pouring concrete near the basketball court. Impacts to pedestrians are expected to be minimal.
For questions or comments on this closure, contact Construction Manager Scylise Little.
The Student Legacy Park fields and tennis courts have reopened, but other areas within the park will remain closed through October 12.
The parking areas and sidewalk on SW Washington Way will remain closed through October 12 along with the basketball courts.
While the entry points to the park along Washington Way will remain closed, access to the park will be available from SW 26th St., SW Intramural Lane and SW 30th St. ADA parking spaces will be available on 30th St., on 26th St. in front of Dixon Recreation Center and on Intramural Lane.
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Student Legacy Park Resurfacing project, the SLP fields and tennis courts will be reopening on Tuesday, September 26th. While the fields and tennis courts will be available for use, other areas within the park will remain closed through October 6.
The parking areas and sidewalk on SW Washington Way will remain closed through October 6 along with the basketball courts.
While the entry points to the park along Washington Way will remain closed, access to the park will be available from SW 26th St., SW Intramural Lane and SW 30th St. ADA parking spaces will be available on 26th St. in front of Dixon Recreation Center and on Intramural Lane.
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Washington Way Improvement project, there will be a street lighting outage along the west side of SW 26th Street from SW Washington Way north to SW Intramural Lane. The outage will continue along the south side of SW Intramural Lane west to SW 30th Street.
This will be an overnight outage from Wednesday, June 28 until mid-day Thursday, June 29.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
As part of the Washington Way Improvement project, there will be a street lighting outage along the west side of SW 26th Street from SW Washington Way north to SW Intramural Lane. The outage will continue along both sides of SW Intramural Lane west to SW 30th Street.
This will be an overnight outage from Tuesday, June 27 until Wednesday, June 28th.
For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.
Student Legacy Park, including all fields, tennis facilities, basketball court and sand volleyball courts will be closed for resurfacing and turf replacement starting on Monday, June 19 and continuing through the summer. The sidewalk on the north side of Washington Way directly adjacent to Student Legacy Park will also be closed. Other possible impacts include noise, dust and mud near the construction site.
For questions or comments on this closure, contact Construction Manager Scylise Little.