As part of an ongoing waterline replacement project led by the city of Corvallis, SW 35th St. will be fully closed to traffic at the railroad crossing starting on Tuesday, January 6 through Friday, January 9. SW Washington Way will also be closed at SW 35th St. Emergency vehicles will be permitted through the closure areas. OSU vehicles will be allowed through the closure zone on Washington Way and across SW 35th St. to access facilities west of the fire station.

Sidewalks will remain open on SW 35th St. The multi-use path will remain open on the south side of Washington Way. Please note that the sidewalk and cycle track on the north side of Washington Way are closed due to a separate project.

A map showing a road closure on SW 35th St.

For questions or comments on this closure, contact Josh Bjornstedt.

The city of Corvallis has closed the southbound lane of SW 30th St. for emergency water line repairs. No end date has been specified at this time and work may continue intermittently throughout the next week.

Please note that closures are still in effect on SW 26th St. and SW Jefferson Way. Information on these additional closures is available here: https://blogs.oregonstate.edu/closurenotices/2025/12/04/12-15-1-8-winter-break-road-closures-on-campus/

Please plan your travel routes accordingly and be prepared to adjust as needed.

As part of an ongoing waterline replacement project led by the city of Corvallis, SW 35th St. will be fully closed at the railroad crossing starting on Monday, Nov. 24 – Wednesday, Nov. 26. SW Washington Way will also be closed at SW 35th St.

Local access will be maintained for OSU employees. OSU vehicles may travel west on Washington Way, through the closure zone, and cross SW 35th St. to access OSU facilities behind the fire station. 

Emergency vehicle access will be permitted.

Bike lanes will be closed. Sidewalks will remain open.

A map showing a road closure on SW 35th St.

Any changes to CTS stops will be posted at the physical location and will be noted on the City’s website. https://www.corvallisoregon.gov/cts

Notifications regarding detours or closures for the Beaver Bus service can be found at the following link. https://transportation.oregonstate.edu/beaver-bus/beaver-bus-route-changes

For questions or comments on this closure, contact Josh.Bjornstedt@corvallisoregon.gov

The city of Corvallis is currently conducting a waterline replacement project on SW 35th St. and SW Western Blvd. During the week of Nov. 17 – Nov. 21, concrete and pavement work will be occurring near the intersection of SW 35th St. and Western Blvd. and in various other locations bordering the OSU campus. In addition, work conducted by NW Natural may be impacting traffic at SW 35th St. and Western Blvd.

All streets are scheduled to remain open, but drivers should be prepared to encounter lane closures and traffic pattern changes along SW 35th St. and Western Blvd.

Bikes may be directed to ride with traffic at times and pedestrians should follow signage regarding detours.

Any changes to CTS stops will be posted at the physical location and will be noted on the City’s website. https://www.corvallisoregon.gov/cts

Notifications regarding detours or closures for the Beaver Bus service can be found at the following link. https://transportation.oregonstate.edu/beaver-bus/beaver-bus-route-changes

For questions or comments on this closure, contact Josh.Bjornstedt@corvallisoregon.gov

As part of an ongoing waterline replacement project led by the city of Corvallis, paving work will be occurring on SW 35th St. and Western Blvd. starting Monday, November 10 – Wednesday, November 12.

Paving will start on SW 35th St. at Washington Way, progress south to Western Blvd. and then west to West Hills Rd.

Streets will remain open and local access to OSU facilities in the area will be maintained, but drivers should expect intermittent closures for through traffic, detours and changes in traffic patterns. Emergency vehicle access will be maintained. Pedestrian detours will be marked with signage.

Any changes to CTS stops will be posted at the physical location and will be noted on the city’s website. https://www.corvallisoregon.gov/cts

Notifications regarding detours or closures for the Beaver Bus service can be found at the following link. https://transportation.oregonstate.edu/beaver-bus/beaver-bus-route-changes 

For questions or comments on this closure, please contact Josh.Bjornstedt@corvallisoregon.gov

This is an update on an ongoing waterline replacement project led by the city of Corvallis.

UPDATE: SW 35th St. will be closed to thru traffic from Western Blvd. to Washington Way starting Monday, October 20 – Friday, October 24

Please see details and map below.

10/20 – 10/24: SW 35th St. closed to all thru traffic

  • Local access for OSU and residents allowed
  • Emergency vehicles will be permitted in this area
  • Drivers should expect to encounter lane shifts and intermittent lane closures
  • Bicyclists will be directed to ride with traffic as needed.
  • Pedestrians may use sidewalks but should expect changes and detours – observe signage.
  • Any changes to CTS stops will be posted at the physical location and will be noted on the City’s website. https://www.corvallisoregon.gov/cts
  • Notifications regarding detours or closures for the Beaver Bus service can be found at: https://transportation.oregonstate.edu/beaver-bus/beaver-bus-route-changes

Western Blvd: intermittent lane shifts and lane closures to accommodate work happening near SW Deon Dr. and SW West Hills Blvd. There will be a one-day closure at the intersection of Deon Dr. and Western Blvd. Access to The Retreat will be maintained via Sagebrush Dr. during the intersection closure.

Water shut-offs

  • Contractor will be coordinating shut-offs during service tie-overs with the impacted owner/occupants.

For questions or comments on this closure, please contact Josh.Bjornstedt@corvallisoregon.gov

This is an update on an ongoing waterline replacement project led by the city of Corvallis.

9/29 – 10/17: SW 35th St. will be fully closed to through traffic at the railroad crossing. Washington Way will be closed between SW 30th – 35th St. Local access for some OSU employees and vehicles will be permitted, but detours will be in place.

Please see details and links to maps below.

OSU Game Day, 9/26 – SW 35th St. will be reopened by 3 p.m. to accommodate Game Day traffic on Friday and over the weekend.

9/29 – 10/17: SW 35th St. closed at railroad crossing, Washington Way closed between SW 30-35th St.

  • Closures will be in effect at all times, including nights and weekends.
  • Emergency vehicles must detour around the area.
  • Local access to OSU facilities permitted, but with significant detours.
    • Western Building & Shops, Oak Creek Urban Center for Horticulture and UHDS – approach from the south.
    • Physical Plants, Biological Curation Building & Boneyard area – approach from Washington Way and cross SW 35th St. east-west.
      • Local access through closure zones will be permitted for OSU vehicles when traveling to these facilities.
      • No right or left turn permitted onto SW 35th St. from Washington Way. OSU vehicles must cross SW 35th St. east-west on Washington Way and then use SW 30th St. as a detour.

For questions or comments on this closure, please contact Josh.Bjornstedt@corvallisoregon.gov

The city of Corvallis will resume work on a waterline replacement project on SW 35th St. next week. SW 35th St. will be closed to through traffic between the Oak Creek Bridge and the railroad crossing starting on Tuesday, September 23. Local access will be available for residents and OSU facilities, but no through traffic will be permitted.

  • SW 35th St. will remain closed overnight and during weekends.
  • Emergency vehicles must detour around the closure – there will not be room for vehicles to pass through the work zone.
  • Bicycle lanes will be closed.
  • The sidewalk will remain open on one side of street, but pedestrians will need to follow signage and switch sides as work progresses.
  • Any changes to CTS stops will be posted at the physical location and will be noted on the city’s website: https://www.corvallisoregon.gov/cts
  • Notifications regarding detours or closures for the Beaver Bus service can be found at: https://transportation.oregonstate.edu/beaver-bus/beaver-bus-route-changes
A map showing a road closure on SW 35th St.

For questions or comments on this closure, contact Josh.Bjornstedt@corvallisoregon.gov.

This is an update on a water pipeline and road improvement project led by the city of Corvallis. Work is expected to continue through September 2025.

Special update

Full closure of SW 35th St. at the Oak Creek bridge starts on Monday, August 4th. The bridge will remain fully closed to ALL traffic, including emergency vehicles, through Friday, August 22. A second closure at the railroad crossing at SW 35th St. and Washington Way is tentatively scheduled for the last week of August. Detours will be in place. SW 35th St. will remain open to traffic on both the north and south sides of the bridge, but no traffic will be allowed to cross. The bridge will remain closed overnight and through weekends. Bike lanes on SW 35th St. will be closed. Sidewalks will remain open.

Paving work will also occur on Western Blvd. during this time frame and traffic impacts in this area are expected. More information about the SW 35th St. closures will be communicated by Friday, August 1.

Planned projects for the week of July 28 – Aug. 1

  • Sidewalk ADA ramp work will continue at SW 15th St. and Western Blvd.

Traffic & travel impacts

  • Both SW 35th St. and Western Blvd. will remain open to vehicle traffic this week.
    • Lane shifts/closures will be in place to create work zones on Western Blvd between SW 15 – 26th St.
    • Bicyclists may be directed to ride with traffic through work zones.
    • Pedestrian detours may be in effect at the Western Blvd./15th St. intersection.
  • Changes to city bus stops will be in effect.

For questions or comments on this closure, contact Josh.Bjornstedt@corvallisoregon.gov.

This is an update on a water pipeline and road improvement project led by the city of Corvallis. Work is expected to continue through September 2025. Typical work hours for this project will be Monday through Friday, 7 a.m. to 5 p.m.  To sign up for updates on this project from the city, visit https://www.corvallisoregon.gov/subscribe and select the Transportation Project – Western Blvd, 35th St, 11th St subscription list.

Planned projects for the week of July 21 – 25

  • Sidewalk ADA ramp work will continue at SW 15th St. and Western Blvd.
  • Electrical work will occur at the SW 15th St./Western Blvd. traffic signal mid-week. See notes below for Wednesday, July 23.  

Traffic & travel impacts

  • Both SW 35th St. and Western Blvd. will remain open to vehicle traffic.
    • Lane shifts/closures will be in place to create work zones on Western Blvd.
  • Wednesday, July 23: traffic signal at SW 15th St./Western Blvd. will shut down and become a 4-way stop. Traffic will be reduced to one lane in each direction. Temporary stop signs will be in place.  
  • Changes to city bus stops will be in effect.
  • Sidewalks may be unavailable at various times in this area and pedestrians will be directed to detour. 

For questions or comments on this closure, contact Josh.Bjornstedt@corvallisoregon.gov.