This is an update to a previous notification.

The sidewalk and parking space closures associated with construction work at the Pride Center have been extended through Friday, April 5.

The sidewalk and parking spaces bordering the Pride Center, on the north side of SW A Ave., will be closed to repair the sidewalk and install lighting. Pedestrians may use the south sidewalk along SW A Ave. as a detour.

The map shows a closure at the SW A Ave. entrance to the parking lot west of the Pride Center. Alternate entrances are marked on SW 15th and SW 17th Streets. Additionally, the sidewalk and street parking spaces bordering the Pride Center on the north side of A Ave. are marked as closed. The south sidewalk is marked as a pedestrian detour.

For questions or comments on this closure, contact Construction Manager Scylise Little.

As part of the Withycombe Hall Renovation project, the south sidewalk on NW Orchard Ave. between NW 27th and NW 30th St. will be closed starting Wednesday, April 3 through Wednesday, April 10. Pedestrians may use the north sidewalk as a detour.

Other possible impacts include noise near the work site.

The map shows a sidewalk closure on the south side of NW Orchard Ave. between NW 27th and NW 30th St. A detour is marked along the north sidewalk.

For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.  

This is an update to a previous notification.

Most parking spaces and sidewalks will be reopened for use with four spots on the west side closed for a boom lift through Wednesday, April 3.  ADA access to Fairbanks Hall is open on the east side of the building.  ADA access is closed on the west side of Fairbanks Hall through Wednesday, April 3.

For questions or comments on this closure extension, contact Project Manager Amy Keene at (541) 737-5312.

As part of the Pride Center Renovation project, the entrance to the B2 parking lot on SW A Avenue (west of the Pride Center) will be closed April 1 – April 5 from 7A.M. to 4 P.M. daily. Vehicles will be able to exit only from this lane.  Alternate entrances to the parking lot will be available on SW 17th St. and SW 15th St. 

Additionally:

  • The area of SW May Ave directly north of the Pride Center will be closed on April 2 to repair an irrigation line.
  • The sidewalk and parking along SW A Ave. directly south of the Pride Center will be closed to repair sidewalk and install lighting on April 3 and 4th.

For questions or comments on this closure, contact Construction Manager Scylise Little.

There will be a building-wide domestic and fire sprinkler water shutdown at Langton Hall on Wednesday, March 27, 2024 from 8 A.M. to 4 P.M. to allow the City of Corvallis to make emergency water line repairs. This shutdown will affect fire sprinklers, restrooms, locker rooms and drinking fountains throughout the building. Restrooms will be available in all adjacent buildings.

For questions or comments on this notice, contact Facilities Services at 541-737-2969.

As part of the Kelley District Utility Plant project, the steam system in Kelley Engineering Center will be shut down on Friday, March 29 from 10 A.M. to 4 P.M. The building will experience small temperature fluctuations and hot water in restrooms will be limited during the shutdown.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Pride Center Renovation project, the entrance to the B2 parking lot on SW A Avenue (west of the Pride Center) will be closed starting Wednesday March 27 through Friday, March 29. This closure will be in effect from 7 A.M. to 4 P.M. daily. The parking lot will remain fully open. The entrance lane will be closed; the exit lane will remain open.

Alternate entrances will be available on SW 17th St. and SW 15th St.

For questions or comments on this closure, contact Construction Manager Scylise Little.

All steam services will be shut down to Snell Hall, from Tuesday, March 26 at 6:30 a.m.- Thursday March 28 3:30 p.m., 2024, to replace multiple failed steam valves. This will affect all steam services building wide. Building occupants may notice air temperature fluctuations during this time and there will be no hot water.

For questions or comments on this closure, contact Jesse Nunez at 541-737-5954.

As part of the Cordley Hall Renewal project, testing of the fire alarm system and FDC System during the week of Spring Break (March 25 through March 28) will occur at Cordley Hall – East. Corvallis Fire Department will be on site testing the fire department connection and venting water from the roof of Cordley Hall – East on the afternoon of March 27th

Cordely Hall fire alarm testing week of spring break March 25 through March 28

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.