Multiple parking lots will be closed in phases starting on Monday, December 16 for underground utility scanning.

ALL vehicles must be removed from these lots prior to 7 a.m. each day, December 16 – December 19. Student vehicles must be removed from these lots prior to leaving campus for winter break.

Please see closure schedule and map below.

December 16, 7am-7pm
3271 Cascade Hall South Lot
3289 S 17th St and A Ave

December 17, 7am-7pm
3280 May Way Lot

December 18, 7am-7pm
3280 May Way Lot
3273 Bloss Hall West Lot

December 19, 7am-7pm
3270 Bloss Hall South Lot
3259 Lasells Stewart Center East Lot

A map showing a closure of multiple parking lots between SW 26th St. and SW 15th St.

For questions or comments on this closure, contact Construction Manager Tarrigon Van Denburg at (714) 390-5313.

This is an update to a previous notification.

Due to ongoing construction work, sections of the SW Washington Way multi-use path will continue to be closed through Friday, December 27. Please see schedule below.

SW 30th – 35th St.: multi-use path closed through 12/20

SW 26th – 30th St.: multi-use path closed through 12/27

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

Starting on Wednesday, December 4, NW Natural will be working to relocate a gas line on SW 35th St. in preparation for a water line replacement project managed by the city of Corvallis, which will begin later this winter. Traffic on SW 35th St. north of Western Blvd will be reduced to a single lane in some sections and flaggers will be present to direct vehicles through the work zones. Drivers should be prepared for delays.

This notice may be updated as the work progresses and information becomes available.

For questions or comments on this closure, contact OSU Project Manger Scott Bond at (541) 974-2520.