As part of the Fairbanks Hall Renovation Project, demolition of the old Fairbanks Annex existing concrete pad, along with the preparation and placement of new concrete for a new transformer pad by the Women’s Building, will occur onsite during the week of Spring Break from Monday, March 21, 2022 through Friday, March 25, 2022.

What to expect:

  • The sidewalk located between the Women’s Building and Fairbanks Hall will be temporarily closed starting Monday, March 21, 2022 through Friday, March 25, 2022.
  • There will be truck traffic in and out of the Fairbanks Hall worksite using the 35th Street/Jefferson Way route. 
  • Expect noise as existing concrete is broken up, demolished and hauled away. The concrete breaking activities will start no earlier than 8 a.m.

For questions or comments on this work, contact Project Manager Amy Keene at 541-737-5312.


Discover more from OSU Corvallis Campus Closures, Shutdowns and Detours

Subscribe to get the latest posts sent to your email.

Comments are closed.