As part of the Burt II Fire Restoration Project, all steam services within Burt II are scheduled to be shutdown. The steam shutdown is scheduled for Wednesday, Sept. 2, 2020, from 7 a.m. to 1 p.m.
For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.
As part of the Washington Way Improvement Project, work related to the demolition of the Quonset Hut that served as the previous home of the Naval ROTC Armory is scheduled to start on Wednesday, Aug. 26 through Thursday, Sept. 17, 2020. Abatement is already completed.
For questions or comments on this closure, contact Construction Manager Lindsey Austin at 541-990-7720.
As part of the Oak Creek HVAC Project, a planned electrical shutdown is scheduled for the Oak Creek Building. The electrical shutdown is scheduled for Saturday, Aug. 22, 2020 from 7 a.m. to 11 a.m. Identified equipment that needs temporary power during the outage has been coordinated with the contractor and will be picked up by a generator.
For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.
For work related to the Pharmacy classroom AC unit upgrade, the shutdown of the 509 chiller that services the north wing of the Pharmacy Building is necessary for the start-up of the new AC unit for Classroom #305. Facilities Services will be monitoring the electrical capacity once the new unit is up and will be restarting the 509 chiller to see if the building electrical capacity is compromised. The shutdown for the 509 chiller is scheduled to start at 8 a.m. on Thursday, Aug. 27 through 5 p.m. on Friday, Aug. 28, 2020.
For questions or comments on this closure, contact Justin Fuszek with Facilities Services at 541-740-5260 or Project Manager John Doty at 541-740-8302.
As part of the Buxton Hall Roof Replacement Project, there will be a crane at Buxton Hall offloading material. One lane of SW Jefferson Way will be closed between SW Weatherford Place and SW Sackett Place. The closure is scheduled for Monday, Aug. 17, 2020 from 7 a.m. to 5 p.m.
For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.
As part of the Buxton Hall Roof Replacement Project, the sidewalk on the south side of SW Jefferson Way from SW Weatherford Place to SW Sackett Place will be closed to support dumpster placement. The closure is scheduled to start on Friday, Aug. 14 through Friday, Sept. 4, 2020.
For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.
Closure extended: For work related to the Cauthorn Hall fire suppression installation, SW Intramural Lane will be closed between SW Weatherford Place and SW 30th Street. The closure is scheduled to start on Friday, Aug. 14 through Friday, Sept. 4, 2020.
For questions or comments on this closure, contact Patrick Robinson at 541-737-2428.
As part of the Merryfield Hall Renovation Project, a planned steam shutdown is scheduled for Merryfield Hall. The steam shutdown is scheduled for Tuesday, Aug. 11, 2020 from 6 a.m. to 5 p.m.
For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.
As part of the Merryfield Hall Renovation Project, a planned domestic water shutdown is scheduled for Merryfield Hall. The water shutdown is scheduled for Monday, Aug. 10, 2020 from 6 a.m. to 12 p.m.
For questions or comments on this closure, contact Construction Manager Jason Lundy at 541-270-0193.