As part of the Kelley District Utility Plant project, the steam system will be shut down in Kelley Engineering Center on Wednesday, October 11 from 9 A.M. to 9 P.M. to allow for repairs and necessary modifications. The building will be without hot water during the shutdown and may experience temperature fluctuations. The 4th floor women’s restroom will also be closed during the shutdown.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave., located directly behind The LaSells Stewart Center and just south of Bloss Hall, will be closed to allow for crane activity on Monday, October 9 from 7 A.M. to 12 P.M. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave., directly behind The LaSells Stewart Center, will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot. 

The LaSells Stewart Center East parking lot (#3259) will remain open.

The map shows a road closure on SW Stadium Ave. directly behind The LaSells Stewart Center. The east and west sidewalks on Stadium Ave., behind The LaSells Stewart Center, are also marked as closed. A vehicle detour is marked from SW Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot. The parking lot is marked as open.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

Due to a chilled water line failure on the east side of Cordley Hall, the North District Utility Plant will be shut down until the failed line can be located and repairs are complete. This shutdown will affect cooling systems in all impacted areas, including all floors of Cordley West, ALS , Nash, Burt and Wilkinson Halls.

Updates will be provided as soon as possible.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.  

As part of the LaSells Stewart Center Mechanical and Roof Renewal project, a section of the northbound lane on SW 26th St., between SW Western Blvd. and The LaSells Stewart Center, will be closed to allow for crane activity on Tuesday, October 3 from 7 A.M. to 2 P.M. Flaggers will be present in the area to direct traffic.

In addition, a section of the sidewalk on the east side of 26th St. will be closed along with the crosswalk near the front entrance and the walkway on the north side of The LaSells Stewart Center. The west sidewalk will remain open for pedestrians.

The map shows a closure in the northbound lane on SW 26th Street, in front of The LaSells Stewart Center. A section of the east sidewalk, between SW Western Blvd. and the CH2M HILL Alumni Center, is marked as closed. The crosswalk near the front entrance of The LaSells Stewart Center is marked as closed.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

The Gilbert Hall elevator will be out of service effective Wednesday, September 27. Due to the need for repair and specialized parts, this is expected to be an extended service outage. A temporary, ADA-accessible ramp will be constructed on the east side of the building which will allow access to the first floor classroom. The ramp is currently under construction and is expected to be complete by Monday, October 2.

ADA access to the Gilbert Hall basement will remain available from the NW Monroe Avenue entrance. Access to the second and third floors will be available via the Gilbert Hall Addition across the bridge into Gilbert Hall.

The map shows an aerial view of Gilbert Hall with a temporary ramp location marked on the east side. The access bridge from the Gilbert Hall Addition is also marked.

For questions or comments on this closure, contact Construction Manager Eric Smith at (541) 409-5037.

As part of the 2023 Parking Maintenance project, multiple parking spaces in the Richardson and Dryden parking lots will be closed from Tuesday, September 26 through Friday, September 29 to allow for landscaping work. The parking lots will remain open during this project. Other possible impacts include noise, dust and mud near the worksite.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.