As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, May 26 from 7 A.M. to 1 P.M. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. The west sidewalk on Stadium Ave. will be closed. The east sidewalk on Stadium Ave. will remain open for pedestrians. A vehicle detour will be available from Western Blvd. along the east and north side of the Bloss Hall South Parking Lot.

The map shows a section of SW Stadium Ave. as closed from SW Western Blvd. to just south of Bloss Hall. The west sidewalk on Stadium Ave. is marked as closed. A vehicle detour is marked from Western Blvd around the east and north sides of the Bloss Hall South Parking Lot.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740 – 5260.

As part of the Rogers Hall fume hood replacement project, a crane will be placed in the Graf Hall parking lot to lift equipment onto the roof of Rogers Hall. The work is scheduled for Monday, March 13 from 6:30 – 9 a.m. Limited parking spaces will remain available.

The image shows where a crane will be placed in the northwest corner of the Graff Hall parking lot. A block of parking spaces in the middle of the parking lot is shown as closed between 6 - 9 a.m. on March 13, 2023.

For questions or comments on this closure, contact Project Manager Dave Amundson at (541) 737-2760

For work related to the Cordley Hall Renovation Project, a crane will be on site near Cordley East from 7 a.m. to 11 a.m. on Wednesday, September 28, 2022. Expect crane activity near Cordley East along SW Campus Way west of 26th Street. The fire lane will be maintained while crane activity takes place.

For questions or comments on this work, contact Construction Manager Jason Lundy at 541-270-0193.

Campus Way crane activity area map

As part of the Cascade Hall exterior stair replacement project, crane work to place exterior stairs on the south side of Cascade Hall will occur on Wednesday, September 14, 2022. A section of parking in this area will be closed while work takes place. The exterior stairs to the second floor of the building will re-open on Thursday, September 15, 2022.

For questions or comments about this closure, contact Project Manager Christina Vinson at 503-420-1031.

Cascade Hall area map

As part of the Nash Hall Elevator project, a crane pick of elevator equipment is scheduled at Nash Hall, and in the building’s loading dock area and around the access road south of building. The Sackett North Lot (lot #3303) areas around Nash Hall will be impacted. Work is scheduled for Thursday, April 8, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall crane work area map

Road closures are scheduled around West Campus residence halls to support work related to the Buxton, Hawley and West roof replacement projects. Work is scheduled to take place from 8 a.m. to 5 p.m., on Friday, Dec. 18, 2020. Work will start at 8 a.m. at SW Intramural Lane south of West Hall. Once complete, work will transition to the west end of Hawley Hall and obstruct SW Sackett Place and the east sidewalk. Then, work will shift to the north of Hawley Hall and Buxton Hall, and one lane of SW Jefferson Way will be closed along with the south sidewalk. Next, work will shift to SW Weatherford Place and will close the road as well as the west sidewalk. Each portion of work is anticipated to take approximately two hours to stage and pick the supplies to the roofs of the buildings. Intramural parking lot #3294 will also be impacted while work takes place.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

Roof work area map
Roo

As part of the Nash Hall Elevator Project, a crane pick will be set up outside of Nash Hall (view map). This will require caution in the surrounding area and the contractor will provide caution tape around critical areas. Work is scheduled to occur on Monday, Nov. 2, 2020.

For questions or comments on this closure, contact OSU Infrastructure Project Manager Aaron Collett at 541-207-2780 or Ausland Group contractor Tom Jordan at 541-228-5197.

Nash Hall area map

For work related to the Buxton Hall roof replacement, there will be a crane at Buxton Hall offloading material from the roof. Both lanes of SW Jefferson Way will be closed at the corner of SW Weatherford Place. The south sidewalk will also be closed to pedestrian traffic at this location. SW Weatherford Place between SW Jefferson Way and SW Intramural Lane will also be closed. The closure is scheduled for Friday, Oct. 16, 2020, from 9 a.m. to 5 p.m.

For questions or comments on this closure, contact Patrick Robinson with University Housing and Dining Services at 541-737-2428.

Buxton Hall and SW Jefferson Way area map