As part of the Kelley District Utility Plant project, a section of the walkway between Kelley Engineering Center and Plageman Hall will be closed on Friday, June 21 to allow for tree removal work. The south entrance to Plageman Hall will be closed.

Other possible impacts include noise and dust near the work site.

A map showing a walkway closure between Kelley Engineering Center and Plageman Hall, just west of SW Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

As part of the Goss Baseball Hitting Building project, SW Washington Way will be closed between SW Benton Place and SW 17th St. starting Thursday, June 20 through Thursday, July 4. The sidewalk on the north side of Washington Way will also be closed in this area.  

The intersections at 17th St. and Benton Place will remain open for north-south vehicle traffic. Vehicles may use Benton Place or 17th St. to detour around the closure area.

Pedestrians traveling eastbound on Washington Way may use the multi-use path on the south side of the street. If using the north sidewalk on Washington Way, pedestrians may cross Washington Way at 17th St. and proceed east on the multi-use path. Pedestrians planning to travel north on Benton Place may take the multi-use path east, cross Washington Way at 15th St. and the proceed west along the north sidewalk to Benton Place.

A map showing a road closure on SW Washington Way between SW Benton Place and SW 17th St. A pedestrian detour is marked around the closure using the crosswalk at 17th St., the multi-use path on the south side of Washington Way, the crosswalk at 15th St. and the north sidewalk on Washington Way westbound to Benton Place.

For questions or comments on this closure, contact Construction Manager Darci Mitchell at (541) 953-5830.

Beginning next week, parking lots across campus will be temporarily closed for repair and maintenance. The closures will occur in phases starting Monday, June 24 – Wednesday, June 26. Please contact Transportation Services at (541) 737-2583 if you require assistance with alternate parking arrangements.

(View OSU parking lot map)

Please see below for specific dates and locations:

Monday, June 24
3204 Adams North Lot
3205 Adams Northeast Lot
3278 Sports Complex East Lot
3280 May Way Lot
3302 W Jefferson Way
3313 Bates Hall North Lot
3331 Radiation Center East Lot
3360 Magruder Hall Northeast Lot
3370 Western Complex Lot
3261 Coleman Field East Lot
3219 Washington Ave

Tuesday, June 25
3302 W Jefferson Way
3363 Magruder Hall South Lot
3268 S Community Place
3222 Weniger Hall East Lot
3217 Adams Ave

Wednesday, June 26
3254 Langton Pl Lot
3103 Jefferson St Building West Lot
3242 Community Hall South Lot

Other possible impacts include noise, dust and mud near the work areas.

For questions or comments on this closure, contact Kristie Liddle at (541) 737-9618.  

Construction activity related to the Weatherford A-wing Remodel project will occasionally impact areas outside the building in the coming weeks. Expected impacts include intermittent closure of the walkway on west side of Weatherford Hall and partial closure of the bike parking area on the south side SW Intramural Lane, across the street from Weatherford. These closures are needed for demo waste removal and materials staging.

An aerial view of Weatherford Hall with closure areas marked on the walkway west of the building and across SW Intramural Lane in the bike parking area.

For questions or comments on this closure, contact Josh Walsh at (541) 737-0927.

As part of the Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex project, the intersection of SW Campus Way and SW Memorial Place will be closed starting on Monday, June 24 through Friday, June 28. The intersection will be closed to vehicle traffic in all directions during this time frame.

The north crosswalk at Campus Way and Memorial Place will be closed. The south crosswalk will remain open for pedestrians.

Memorial Place between Monroe Ave and Campus Way is already closed to vehicle traffic under a previous notification.

A map showing a road closure at the intersection of Campus Way and Memorial Place. The north crosswalk at the intersection is marked as closed.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.

As part of the Bloss Hall Renovation project, a section of the Bloss Hall South parking lot will be closed starting Tuesday, June 18 through Friday, August 30. The impacted parking spaces are located on the north side of the parking lot. The sidewalk and walkway areas on the west and north sides of Bloss Hall will also be closed.

A map showing an aerial view of Bloss Hall. A section of parking spaces on the north side of the Bloss Hall South parking lot is marked as closed. The sidewalk and walkway on the west and north sides of the building are marked as closed.

For questions or comments on this closure, contact Josh Walsh at (541) 737-0927.

This is an update to a previous notification.

Due to occupant concerns within Weniger Hall, the June 18 electrical outage has been rescheduled for the week of July 15. The exact date will be communicated when Pacific Power confirms their revised outage date.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193 or Dustin Sievers at (541) 737-5127.

As part of the Kelley District Utility Plant project, Johnson Hall will be closed for a planned power outage impacting all floors of the building. This closure will take place on Monday, June 17 from 6 A.M. to 2 P.M. All HVAC equipment will be shut down during this outage. No access to the building will be permitted during this closure.

What do you need to do to prepare for this outage? 
Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Monday, June 17. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Washington Way Improvement project, SW 30th Street will be closed in both directions from SW Washington Way to SW Campus Way. The closure will be in effect starting Monday, June 17 through Friday, June 28. The intersections at Jefferson Way and Campus Way will remain open.

The sidewalks in this section of SW 30th St. will remain open.

Other possible impacts include noise, dust and mud near the work site.

A map showing a closure of SW 30th St. in both directions from SW Washington Way to SW Campus Way.

For questions or comments on this closure, contact Project Manager Aaron Amoth at (541) 207-5084.