This is an update to a previous notification.

There will be mechanical fastening work occurring in Owen Hall classrooms 101 and 102 on Wednesday, January 3 and Thursday, January 4 from 8:00AM – 4:00PM daily. There will be noise impacts due to this work, mainly drilling.

For questions or comments on this closure, contact Project Manager John Doty at (541) 740-8302.

All steam services will be shut down to West Greenhouse, Friday December 29th, 2023, from 5 a.m. -7:00 a.m. to replace a leaking steam trap.  The building may experience temperature fluctuations and hot water may be unavailable during this time.

For questions or comments on this closure, contact Facilities Services    at 541-737-2969.

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns and Detours page for updates on this and other campus closures.

Please forward this notice to anyone who would benefit from this information.

As part of work for the Kelley District Utility Plant project and the Jen-Hsun and Lori Huang Collaborative Innovation Complex, Johnson Hall will be CLOSED on January 3, 2024 for construction-related activities. Water service to the building will shut off from 7:00 AM – 7:00 PM and electrical service to the building will be shut off from 7:00 AM – 9:00 AM. There will be no access to the building on January 3 to ensure safety.  

For questions or comments on this closure, contact Construction Manager Justin Fuszek or Construction Manager Jason Lundy.

Generator back up standby power to Johnson Hall will be shut down on January 3rd, 2024, from 7 a.m. – 9 a.m.  This will affect all standby electrical and generator backed electrical.

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers, and other electronic devices are turned off prior to 1/2/24. If you have an Uninterruptable Power Supply (UPS), also known as a battery backup, please be sure to turn it off as well. The building will not have network connectivity during this power outage, i.e. no wireless, wired internet or VoIP phone connectivity. Anything that relies on the network will not be functional.

For questions or comments on this notice, contact, Facilities Services at 541-737-2969.

As part of work for the West Greenhouse project, SW Campus Way will be one vehicle lane only with flaggers for landscaping work on 12/28/23 from 9:00 AM – 12:00 PM. The sidewalk on the north side of the street will be detoured to the south side of SW Campus Way.

For questions or comments on this closure, contact Construction Manager Scylise Little.

An electrical shutdown will occur at Magruder Hall on Wednesday, December 27 from 6 A.M. to 10 A.M. The shutdown will impact the wet lab in Room 274 along with supporting HVAC and cold room equipment. The HVAC system and air flow in these areas will be affected during this shutdown.

What do you need to do to prepare for this outage? 

Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Wednesday, December 27. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations.

For questions or comments on this closure, contact Building Manager Ryan Mitchell at (541) 619-7791.

Pacific Power is scheduling a power outage to make repairs to equipment at Gill Coliseum. The outage will be Wednesday December 27th beginning at 5:00 am with an estimated completion time of 7 am. Please see the list of impacted buildings below. These buildings will be closed to the public during the outage.
Affected buildings:
• Bloss Hall
• Finley Hall
• Arnold Dining Center
• Dixon Recreation Center
• Gill Coliseum
What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers, and other electronic devices are turned off prior to 12/27/23. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. The building will not have network connectivity during this power outage, i.e. no wireless, wired internet or VoIP phone connectivity. Anything that relies on the network will not be functional.
For questions or comments on this notice contact, Facilities Services at 541-737-2969.

This is an update to a previous notification.

The intersection at SW 26th St. and NW Orchard Ave. will remain closed through Wednesday, December 20.

The map shows an intersection and crosswalk closure at NW Orchard Ave. and SW 26th St., near Johnson Hall.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.