As part of the Kelley District Utility Plant Project, Kelley Engineering Center and Plageman Student Health Center will be closed for a planned power outage on Wednesday, March 26 from 4 – 8 a.m.
What do you need to do to prepare for this outage?
Please ensure that all electronic devices not connected to emergency power are powered down and that all computers, printers, copiers and other electronic devices are turned off prior to Wednesday, March 26. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. Please ensure that all fume hoods are closed before leaving the labs.
Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations
For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.
Discover more from OSU Corvallis Campus Closures, Shutdowns and Detours
Subscribe to get the latest posts sent to your email.