Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): August 7th-August 11th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

August 7th

  • Dryden Hall
  • Peavey Forest Science Center
  • Richardson Hall 

August 8th

  • Energy Center
  • Heckert Lodge
  • Reed Lodge

August 9th

  • Kearney Hall
  • Merryfield Hall          
  • Owen Hall

August 10th

  • Reser Stadium East
  • Valley Football Center

August 11th

  • Gill Coliseum
  • Sports Performance Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

As part of the Washington Way Improvement project, SW Washington Way between SW 15th and SW 26th Streets will be closed to vehicle traffic from Monday, August 7 through Thursday, September 7. This is an update to the existing Washington Way closure.

In addition, the intersection and crosswalks at Washington Way and SW 17th St. will be closed. The sidewalk on the north side of Washington Way between 15th St. and SW Benton Place will also be closed. The multi-use path on the south side of Washington Way will remain open as a pedestrian detour.

Other possible impacts include noise, dust and mud near the work site.

The map shows a marked section of SW Washington Way between SW 15th St. and SW 26th Street.

For questions or comments on this closure, contact Project Manager Aaron Amoth at (541) 207-5084.

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind The LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, August 4 from 7 A.M. to 3:30 P.M. The B2 parking lot east of The LaSells Stewart Center will also be closed. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave. directly behind The LaSells Stewart Center will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot. 

The map shows a road closure on SW Stadium Ave. directly behind The LaSells Stewart Center. The east and west sidewalks on Stadium Ave., behind The LaSells Stewart Center, are also marked as closed. The LaSells Stewart Center East parking lot is marked as closed. A vehicle detour is marked from SW Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

Effective Date(s):

  • Lot restriping: Wednesday, August 9 & Thursday, August 10
  • ADA/reserved parking space closures & sidewalk impacts: August 9 through December 31


As part of the Jen-Hsun & Lori Huang Collaborative Innovation Complex project, the south-west section of the Park Terrace St. East parking lot, located just north of Plageman Hall, will be closed for restriping and construction prep work.

This is a two-part closure. The restriping work will occur on Wednesday, August 9 and Thursday, August 10. The impacted section of the parking lot will then reopen. The second closure will impact the ADA and reserved parking spaces closest to Plageman and will be in effect through December 31. This section will be enclosed with construction fencing, which will extend onto the sidewalk on the east side of SW Park Terrace Place.

The construction fencing enclosure will obstruct a small section of the sidewalk on either side of the first parking lot entrance north of Plageman. The walkway along the north side of Plageman, bordering the ADA parking spaces, will also be closed through December 31.

For questions or comments on this closure, contact Project Manager Dustin Sievers at (541) 760-6240 or Construction Manager Jason Lundy at (541) 270-0193.

As part of the Kerr South Parking Lot project, the south entrance of the Kerr Administration Building will be closed along with the south sidewalk, the ADA ramp and the west walkway. This closure will be in effect through August 31.

ADA access will be maintained via the east entrance between the Kerr A and B buildings.

The sidewalk east of the building along SW 15th St. will also remain closed (see previous notification). Other possible impacts include noise, dust and mud near the work site.

The map shows a closure along the west and south walkways at the Kerr Admin Building. The ADA ramp and the south entrance to the building are marked as closed. The sidewalk east of the building along SW 15th St. is also marked as closed. An ADA access route is marked on the north side of the building, leading to the east entrance.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609 – 6111.

A planned power outage will impact the 2nd floor of Rogers Hall on Wednesday, August 2 from 7:30 – 8:30 A.M.

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Wednesday, August 2. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations.

For questions or comments on this closure, contact Construction Manager Eric Smith at (541) 409 – 5037.

Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): July 31st-August 4th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

July 31st

  • Gleeson Hall
  • Wiegand Hall
  • Bexell Hall

August 1st

  • Langton Hall
  • Moreland Hall
  • Waldo Hall

August 2nd

  • Covell/Batcheller
  • Dearborn Hall
  • Rogers Hall

August 3rd

  • Gilbert Hall
  • Gilbert Hall Addition
  • Graf Hall

August 4th

  • Linus Pauling
  • Plageman Student Health Center
  • Weniger Hall

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind The LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Thursday, August 10 from 7 A.M. to 3:30 P.M. The B2 parking lot east of The LaSells Stewart Center will also be closed. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave. directly behind The LaSells Stewart Center will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot. 

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.