Convergint will be conducting annual fire alarm & sprinkler testing. Testing will take place in the buildings listed below. The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building. Signage will be posted on exterior doors while testing is being conducted.

July 8th  

  • Cordley Hall

July 9th

  • Bates Hall
  • Hallie E. Ford Center

July 10th

  • Wilkinson Hall
  • Ballard Extension Hall
  • Plageman

July 11th

  • Johnson Hall
  • Kelley Engineering Center

July 12th  

  • Bexell Hall
  • Weniger Hall
  • Gleeson Hall

For questions or comments on this notice contact,  Alarm Shop at 541-737-2969.

As part of ongoing construction projects in the north campus area, there will be a planned power outage affecting all floors of Weniger Hall and Plageman Hall on Wednesday, July 10 from 7 A.M. to 4 P.M.

Weniger Hall will be closed during this outage. No access to the building will be permitted during this time frame.

Four service parking spaces in the Weniger Hall East lot will be closed to allow a trailer-mounted generator to be installed.

Please note: Backup generators for critical equipment are available on a very limited basis. Please contact Brandon Holden at Facilities Services if you need assistance.

What do you need to do to prepare for this outage? 
Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Wednesday, July 10. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193 or Dustin Sievers at (541) 737-5127.

This is an update to a previous notification.

Due to occupant concerns within Weniger Hall, the June 18 electrical outage has been rescheduled for the week of July 15. The exact date will be communicated when Pacific Power confirms their revised outage date.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193 or Dustin Sievers at (541) 737-5127.

This is an update to a previous notification.

Weniger Hall will be closed during the planned power outage on Tuesday, June 18 from 7 A.M. to 3 P.M. No access to the building will be permitted during this time frame.

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.

As part of ongoing construction projects in the north campus area, there will be a planned power outage affecting all floors of Weniger Hall and Plageman Hall on Tuesday, June 18 from 7 A.M. to 3 P.M.  

Four service parking spaces in the Weniger Hall East lot will be closed to allow a trailer-mounted generator to be installed.

Please note: Backup generators for critical equipment are available on a very limited basis. Please contact Brandon Holden at Facilities Services if you need assistance.

What do you need to do to prepare for this outage? 
Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Tuesday, June 18. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.

On Wednesday, March 27th, 2024 from 7:00 am – 5:00 pm, the parking lot east of Weniger (view map) will be partially closed to accommodate the crane for maintenance work on Gilbert Hall roof.

For questions or comments on this closure, contact Facilities Services at 541-737-2969.

Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): July 31st-August 4th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

July 31st

  • Gleeson Hall
  • Wiegand Hall
  • Bexell Hall

August 1st

  • Langton Hall
  • Moreland Hall
  • Waldo Hall

August 2nd

  • Covell/Batcheller
  • Dearborn Hall
  • Rogers Hall

August 3rd

  • Gilbert Hall
  • Gilbert Hall Addition
  • Graf Hall

August 4th

  • Linus Pauling
  • Plageman Student Health Center
  • Weniger Hall

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

Pacific Power is scheduling a power outage to make immediate repairs to equipment in an underground vault outside student health. The outage will begin Sunday morning April 2, 2023 beginning at 5:00 am with an estimated completion time of 8 am.  Please see the list of impacted buildings below. These buildings will be closed to the public during the outage.

 Affected buildings:

  • Plageman Student Health Center
  • Weniger Hall

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers, and other electronic devices are turned off prior to Sunday,  April 2nd. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. The building will not have network connectivity during this power outage, i.e. no wireless, wired internet or VoIP phone connectivity. Anything that relies on the network will not be functional.