As part of the Richardson Hall Solar project, a crane will be working on the east side of Richardson Hall on Tuesday, October 22. The crane will be lifting materials and equipment on to the roof. The driveway and loading area will be closed on the east side of Richardson Hall. The east side entrance to the building will also be closed.

Several parking spaces on the east side of the building will be closed.

A map showing a closure of the driveway, loading zone and building entrance on the east side of Richardson Hall.

For questions or comments on this closure, contact Construction Manager Liz Roach at (701) 371-2938.

As part of the Richardson Hall Solar project, a crane will be working on the east side of Richardson Hall to lift materials and equipment on to the roof. The driveway and loading area will be closed on the east side of Richardson Hall. The east side entrance to the building will also be closed.

Several parking spaces on the east side of the building will be closed.

A map showing a closure of the driveway, loading zone and building entrance on the east side of Richardson Hall.

For questions or comments on this closure, contact Construction Manager Liz Roach at (701) 371-2938.

As part of the Richardson Hall Chiller and Controls Replacement project, hot and cold laboratory water will be shut down on Tuesday, October 15 from 6 a.m. to 12 p.m.

This shutdown will only impact hot and cold water in laboratories. Restrooms and kitchenette water will not be impacted.

For questions or comments on this closure, contact Project Manager Ryan Wilson at (503) 779-3488.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing. 

Week of July 1st 

  • Cascade Hall 
  • Reser Stadium East 
  • Merritt Truax Indoor Center 
  • Magruder Hall Onan 
  • Magruder Hall Generac 

Week of July 8th 

  • Lab Animal Resources Center 
  • Dryden Hall 
  • George W. Peavy Forest Science Center 
  • Richardson Hall 

Week of July 15th 

  • Energy Center 
  • Precision Agriculture Systems Center 
  • RAIL 
  • Austin Hall & Learning Innovation Classroom Building 

Saturday July 20th 

  • Nash Hall & Linus Pauling Science Center 
  • Agricultural & Life Sciences Building 

Week of July 22nd 

  • Hallie E. Ford Center 
  • Milam Hall  
  • Burt Hall 
  • Dearborn Hall 

Week of July 29th 

  • Milne Computer Center 
  • The Valley Library 
  • Pharmacy 
  • Western Shops  

For questions or comments on this notice contact, Facilities Services at 541-737-2969. 

As part of the Richardson Hall Controls project, a crane will be working in the Forest Science Lab parking lot on Thursday, June 13 from 8 A.M. to 3 P.M. Ten parking spaces will be closed during this time frame. The west entrance of Richardson Hall will be closed intermittently while the crane is operating.

Other possible impacts include noise near the worksite.

A map showing a parking space closure and crane location at the east side of the Forest Science Lab parking lot near Richardson Hall.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Richardson Hall Chiller & Controls Replacement project, a section of the Richardson Hall parking lot will be closed from Thursday, May 2 through Friday, May 3. The closed section will be located at the north end of the parking lot, directly east of Richardson Hall. The closure is necessary to allow for the installation of temporary, trailer-mounted chillers.

Other possible impacts include noise near the worksite.

A closure marked at the north end of the Richardson Hall parking lot, on the east side of the building.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Building Controls and Mechanical Renewal project, power will be shut down to Richardson Hall building-wide so that building controls can be replaced starting Friday, April 26 at 5:00pm, ending Saturday, April 27 at 8:00 am. All equipment on emergency power will be energized through the shutdown and lab spaces will maintain minimal ventilation.

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Friday, April 26 at 5:00pm. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well.  Also, please ensure that all fume hoods are closed before leaving labs.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.