As part of the 20 & 21 West Greenhouse project, a portion of sidewalk will be closed to pedestrian traffic between SW 30th and 35th streets on SW Campus Way for ADA access and sidewalk improvement work. The month-long closure is scheduled to start on Friday, January 7, 2022 through Sunday, February 7, 2022. Direct access to the 20 & 21 greenhouses can be made at their north side doors.

For questions or comments on this closure, contact Project Manager Amy Keene at 541-737-5302.

Campus Way area map

For work related to the Completing Reser Stadium project, outside air for multiple buildings including the Valley Football Center, Merritt Truax Indoor Center, and Magruder Hall, will be shut down from 7:30-8:30 a.m. on Friday, January 7, 2022 during the planned implosion of the stadium’s west side.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

A planned shutdown for the elevator located in Rogers Hall is scheduled to start on Wednesday, January 5, 2022 through Friday, February 25, 2022. Renovation work will be performed during the shutdown. Impacted buildings include Rogers Hall, Graf Hall and Dearborn Hall.

For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.

Rogers Hall area map

As part of the Graf Hall Renovation Project, a section of sidewalk on the north side of Graf Hall will be closed for excavation work for a new sidewalk and building entry. During the closure, pedestrian traffic will be routed to the north side of Monroe Avenue. The closure is scheduled to start on Tuesday, January 4, 2022 through Friday, January 14, 2022.

For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.

Graf Hall area map

For work related to the Completing Reser Stadium project, updated closure dates for the Zone 2 area of the Reser Stadium parking lot (lot #3281) are scheduled for preparation and day-of work for the planned implosion of the stadium’s west side. The updated closure, including parking spaces in parking lot #3281 located between the west side of the stadium and the creek, is scheduled to start on Monday, January 3, 2022 through Monday, January 10, 2022. Between 7 and 8 a.m. on January 7, 2022, licensed contractors will use explosive charges to implode the stadium’s west side. The Zone 2 area of the lot will be used for loading in containers to sit parallel to Oak Creek.

For questions or comments on this closure, contact Construction Manager Deena Magana at 541-636-8836.

Reser Stadium Zone 2 area map

For work related to the Completing Reser Stadium project, starting on Monday, January 3, 2022 through Monday, January 10, 2022, a temporary entrance and exit driveway will be constructed along SW 26th Street and five ADA parking spaces will be temporarily closed. A temporary sidewalk closure along SW 26th Street is also planned.

On Monday, January 10, 2022, the temporary driveway areas along SW 26th Street will reopen to all traffic, parking lot fencing for the scheduled implosion of the stadium’s west side on January 7, 2022 will be removed, and site fencing for the new wellness clinic will be set up. Temporary traffic impacts along SW 26th Street related to conduit installation work being performed by Pacific Power are also expected. One lane of traffic along SW 26th Street will remain open while work is being performed.

For questions or comments on this closure, contact Construction Manager Deena Magana at 541-737-8836.

Reser Stadium area map

For work related to the Completing Reser Stadium project, a parking closure is scheduled in the Zone 2 area of the Reser Stadium parking lot for preparation and day-of work for the planned implosion of the stadium’s west side. Between 7 and 8 a.m. on January 7, 2022, licensed contractors will use explosive charges to implode the stadium’s west side. The Zone 2 area of the lot will be used for loading in containers to sit parallel to Oak Creek. The closure is scheduled to start on Wednesday, January 5 through Friday, January 7, 2022. The area will reopen for use at the end of the day on January 7.

For questions or comments on this closure, contact Construction Manager Deena Magana at 541-737-8836.

Reser Stadium parking lot Zone 2 area map

As part of the Fairbanks Hall Renovation Project, pressurizing steam piping for Fairbanks Hall will occur on the afternoon of Thursday, December 23, 2021 to burn off residual protective oils prior to covering the pipes in insulation and framed walls. We expect this to create an amount of smoke, and an active fire watch will be in place on every floor at Fairbanks Hall while work is taking place.

For questions or comments on this work, contact Project Manager Amy Keene at 541-737-5312.

Fairbanks Hall area map

For work related to the Fairbanks Hall Renovation Project, planned power outages are scheduled for Tuesday, December 21, 2021 and will impact Langton, Moreland and Waldo halls. Pacific Power and Fortis Construction will coordinate and work to install a new vault, transformer, and feeds during the planned power outages.

For questions or comments on this work, contact Project Manager Amy Keene at 541-737-5312.