On Wednesday, March 27th, 2024 from 7:00 am – 5:00 pm, the parking lot east of Weniger (view map) will be partially closed to accommodate the crane for maintenance work on Gilbert Hall roof.
For questions or comments on this closure, contact Facilities Services at 541-737-2969.
As part of the Pride Center Renovation project, the entrance to the B2 parking lot on SW A Avenue (west of the Pride Center) will be closed starting Tuesday, March 19 through Friday, March 22. This closure will be in effect from 7 A.M. to 1 P.M. daily. The parking lot will remain fully open. The entrance lane will be closed; the exit lane will remain open.
Alternate entrances will be available on SW 17th St. and SW 15th St.
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Patricia Valian Reser Center for the Creative Arts project, the west sidewalk on SW Benton Place will be closed between SW Langton Place and SW Washington Way starting Tuesday, March 19 through Friday, March 22. Three street parking spaces will also be closed near the intersection of Benton Place and Washington Way.
Pedestrian detour
From Washington Way: take Washington Way east to 15th St., proceed north to Jefferson Way and then west to Benton Place. Use the west sidewalk on Benton Place to travel south to Langton Place.
From Langton Place: using the west sidewalk, take Benton Place north to Jefferson Way. Travel east to 15th St. and proceed south to Washington Way.
From Jefferson Way: take Jefferson Way east to 15th St. and proceed south to Washington Way
Other possible impacts include noise near the work site.
For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.
NW Orchard Ave. will resume two-way traffic between NW 27th and NW 30th Streets starting on Friday, March 15 at 3 P.M. The street was previously limited to one-way traffic due to construction activity related to the Cordley Hall Renewal project.
For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.
The water will be shut down in Oak Creek Building March 15, 2024 from 6:00 am to 3:00 pm to repair a leak. This will affect all water in restrooms, custodial closets, sinks & drinking fountains.
For questions or comments on this notice contact, Facilities Services at 541-737-2969.
As part of the Pride Center Renovation project, the entrance to the B2 parking lot on SW A Avenue (west of the Pride Center) will be closed starting Wednesday, March 13 through Friday, March 15. This closure will be in effect from 7 A.M. to 1 P.M. daily. The entrance lane will be closed; the exit lane will remain open.
Alternate entrances will be available on SW 17th St. and SW 15th St. Other possible impacts include noise near the work site.
For questions or comments on this closure, contact Construction Manager Scylise Little.
As part of the Cordley Hall Renewal project, standby generator testing and transfer switch testing will occur on Tuesday, March 12 from 6 am – 8 am. This work may result in generator noise in the area.
What do Cordley Hall residents need to do to prepare for this testing? Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Tuesday, March 12. If you have an Uninterruptible Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well.
For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193
Due to an emergency sewer line repair associated with the Cordley Hall Renewal project, a vacuum truck will be working in the area just east of Cordley Hall through Tuesday, March 12. This work may result in noise impacts for building occupants and the surrounding area.
For questions or comments on this closure, contact Project Manager Dustin Sievers at (541) 760-6240.
As part of the Kelly District Utility Plant project, Campus Way will be closed between 26th St. and Memorial Place starting Tuesday, March 12 through Friday, March 15 to allow for crane activity. The south entrance of Kelley Engineering Center will be closed.
The north sidewalk in this section of Campus Way will be closed to pedestrians. The south sidewalk will remain open as a detour.
Bicycle lanes in this section of Campus Way will be closed in both directions. A bicycle detour will be available along the walkway on the south side of Milam Hall.
For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.
The steam will be shut down in Weniger Hall March 6, 2024 5:00 am – 7:00 am to replace steam trap. This will affect all steam services, including autoclaves, hot water and heat building wide.