Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): August 14th-August 18th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

August 14th  

  • Beth Ray
  • Cascade Hall
  • Parking Structure

August 15th

  • Kerr Administration/ Kerr B210 Data Room
  • McAlexander Field House

August 16th

  • Goss Stadium
  • Snell Hall/ MU East

August 17th

  • Ballard Extension Hall
  • Bates Hall
  • Hallie Ford

August 18th

  • Gilmore Annex
  • Gilmore Hall
  • Hovland Hall
  • Nash Hall

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

As part of the Student Legacy Park Resurfacing project, a pick-up truck and trailer will temporarily block the northbound lane on SW Benton Place, directly in front of the McAlexander Fieldhouse main entrance, on Thursday, July 27 & Friday, July 28 for various short intervals throughout both days. The truck will be picking up materials from McAlexander Fieldhouse and each pick-up will take approximately 30 minutes for loading.

Additionally, the loading zone and double doors on the south end of McAlexander Fieldhouse will be occupied during this project. Access to the batting cage door will be maintained. The west sidewalk along Benton Place and the crosswalk in front of McAlexander Fieldhouse will remain open for pedestrians. The southbound lane will remain open for vehicles.

The image shows an aerial view of McAlexander Fieldhouse on SW Benton Place with a section of the northbound lane in front of the main entrance highlighted. The loading zone near the south doors is also highlighted.

For questions or comments on this closure, contact Construction Manager Scylise Little.



As part of the Student Legacy Park Resurfacing project, a pick-up truck and trailer will temporarily block the northbound lane on SW Benton Place, directly in front of the McAlexander Fieldhouse main entrance, on Thursday, July 13 & Friday, July 14 for various short intervals throughout both days. The truck will be picking up materials from McAlexander Fieldhouse and each pick-up will take approximately 30 minutes for loading.

Additionally, the loading zone and double doors on the south end of McAlexander Fieldhouse will be occupied during this project. Access to the batting cage door will be maintained. The west sidewalk along Benton Place and the crosswalk in front of McAlexander Fieldhouse will remain open for pedestrians. The southbound lane will remain open for vehicles.

The image shows an aerial view of McAlexander Fieldhouse on SW Benton Place with a section of the northbound lane in front of the main entrance highlighted. The loading zone near the south doors is also highlighted.

For questions or comments on this closure, contact Construction Manager Scylise Little.

As part of the Student Legacy Park Resurfacing project, a pick-up truck and trailer will temporarily block the northbound lane on SW Benton Place, directly in front of the McAlexander Fieldhouse main entrance, on Friday, July 7 for various short intervals throughout the day. The truck will be picking up materials from McAlexander Fieldhouse and each pick-up will take approximately 30 minutes for loading. No parking impacts are expected. The south sidewalk along Benton Place and the crosswalk in front of McAlexander Fieldhouse will remain open for pedestrians. The southbound lane will remain open for vehicles.

The map shows SW Benton Place, in front of McAlexander Fieldhouse, with a section of the northbound lane highlighted.

For questions or comments on this closure, contact Construction Manager Scylise Little.

For work related to the Snell Hall low-rise 080 completion project, an electrical shutdown is scheduled from 5:30-7:30 a.m. on Monday, September 19, 2022. Impacted buildings include Snell Hall and McAlexander Fieldhouse.

For questions or comments on this work, contact Project Manager Carrie Trant at 541-737-5930 or Dale Sovereign at 971-271-2953.

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers, and other electronic devices are turned off prior to the start of the scheduled stand-by generator testing. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well.

For work related to the Arts and Education Complex project, a temporary water shutdown is scheduled for Tuesday, September 14, 2021 so that the City of Corvallis can work on the city waterline. McAlexander Fieldhouse and the old heat plant will be without water from 8 a.m. to 4 p.m. that day.

For questions or comments on this closure, contact Construction Manager Rick Freeman at 541-231-5368.

Temporary water shutdown area map