Air handler #3 (AHU3) will be shut down in Magruder Hall on June 24th, 2024 between 7:00 am – 10:00 am to perform preventative maintenance on the unit. This should only affect the library and the southeast offices. Building occupants may notice warmer than normal air temperatures and reduced airflow during this time.

For questions or comments on this closure contact Richard Olsen at 541-737-7025.

As part of the Kelley District Utility Plant project, Johnson Hall will be closed for a planned power outage impacting all floors of the building. This closure will take place on Monday, June 17 from 6 A.M. to 2 P.M. All HVAC equipment will be shut down during this outage. No access to the building will be permitted during this closure.

What do you need to do to prepare for this outage? 
Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Monday, June 17. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

The air handlers will be shutdown in Magruder Hall on June 11 & 12, 2024 between 5:00 am – 10:30am for 45 minutes each to replace final filters and perform preventative maintenance on units. This will affect heat and cooling building wide and cause reduced airflow during this time.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

The air handler in Richardson Hall will be shut down for maintenance March 21, 7:00 am – April 1, 2024 5:00 pm for replacement of coils and sealing the floor and pipes in air handler to prevent leaks. This will affect heat and cooling and building wide and cause reduced airflow and to labs during this time.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

The air handler in Gilbert Hall will be shut down for maintenances March 22, 7:00 am – April 2, 2024 5:00 pm for replacement of coils and sealing the floor and pipes in air handler to prevent leaks. This will affect heat and cooling and building wide and cause reduced airflow and to labs during this time.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

As part of the ALS Building Controls and Equipment Replacement project, the Agricultural and Life Sciences Building will be closed on Wednesday, February 14 from 5 A.M. to 7 A.M.  The air handlers and exhaust system will be shut down building-wide during the closure. No entry will be permitted. Reasonable indoor temperatures will be maintained during the closure.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

The building air fans will be shut down one at a time to perform preventive maintenance and change air filters in Ag. Life & Sciences February 14, 2024 6:00 am – 12:00 pm. Building occupants may notice slight pressure & air flow changes throughout the building.

For questions or comments on this closure contact Facilities Services at 541-737-2969.

As part of building controls and equipment replacement projects at the Agriculture and Life Sciences Building, the building will be closed on Saturday, January 6 from 5 A.M. to 7 A.M. The air handling and exhaust system will be shut down building-wide. The building will be fully closed and entry will not be permitted.

Reasonable indoor temperatures will be maintained during the shutdown and there will not be impacts to other equipment or building systems.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

An electrical shutdown will occur at Magruder Hall on Wednesday, December 27 from 6 A.M. to 10 A.M. The shutdown will impact the wet lab in Room 274 along with supporting HVAC and cold room equipment. The HVAC system and air flow in these areas will be affected during this shutdown.

What do you need to do to prepare for this outage? 

Please make sure that all computers, printers, copiers and other electronic devices are turned off prior to Wednesday, December 27. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. 

Employees scheduled to work when buildings are without power should consult with their supervisors regarding work schedules. For more information regarding work scheduling, please refer to the instructions regarding Interruptions of University Operations.

For questions or comments on this closure, contact Building Manager Ryan Mitchell at (541) 619-7791.

Nash AHU59 (air handler units) will be shut down to replace failed VFD drives for fan motors,  AHU59 will be shutdown from 6am September 19th to 4pm September 20th. This will affect air flow to the labs on all floors and there will be very limited heating or cooling during this time. Exhaust fans will continue to run but fume hoods should not be used during this time and fume hood sashes should remain closed.

For questions or comments on this closure contact Facilities Services at 541-737-2969.