As part of the Building Controls and Mechanical Renewal project, the chilled water system that feeds the Agricultural and Life Sciences Building and Nash Hall will be shut down to allow for piping work. The buildings may experience elevated temps during the shutdown, but no large temperature swings are expected.

Growth chambers, cold rooms and server rooms will be not affected by this shutdown.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

This is an update to a previous notification.


As part of the Pride Center Renovation project, intermittent closures of roadways and sidewalks will continue to impact the area from Saturday, April 6 through Friday, April 12.

There are three closure areas to be aware of:

  • A section of the north sidewalk on A Avenue, bordering the Pride Center, will be closed, 4/6 – 4/10. Pedestrians may use the south sidewalk as a detour.
  • A section of May Avenue, behind the Pride Center, will be intermittently closed, 4/8 – 4/10.
  • The entry lane to the parking lot west of the Pride Center, off of A Avenue, will be intermittently closed, 4/8 – 4/12. The parking lot will remain open and an alternate entrance is available off of 17th St.
The map shows three closure areas around the OSU Pride Center work site. The entry lane of the parking lot west of the Pride Center is marked as intermittently closed from April 8 through April 12. A section of the north sidewalk on SW A Avenue, bordering the Pride Center, is marked as closed from April 6 through April 10. A section of SW May Avenue, behind the Pride Center, is marked as intermittently closed from April 8 through April 10.

For questions or comments on this closure, contact Construction Manager Scylise Little.