As part of the Washington Way Improvement project, Washington Way between 30th – 35th St. will be closed for paving on April 7, from 6 a.m. – 2 p.m. The intersection at 35th St. will be open all day for north-south traffic. Expect to see flaggers in the intersection from 8 a.m. – 12 p.m. Other possible impacts include noise, dust and mud near the construction site.

The map shows a road closure on Washington Way between 30th and 35th St.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Washington Way Improvement project, Washington Way between 30th and 35th St. will be closed on Tuesday, March 21 and Wednesday, March 22. Flaggers will be present at the 35th St. intersection to direct traffic. Other possible impacts include dust, mud and noise near the construction site.

The map shows Washington Way with a road closure highlighted between 30th and 35th Streets.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Washington Way Improvement project, Washington Way between 17th & 26th Streets will be closed to vehicle traffic on Wednesday, March 8 from 12 – 4 p.m. The intersection at 26th St. will remain open with flaggers present to direct north, south and westbound traffic. Pedestrian crosswalks will also remain open. Other possible impacts include noise, mud and dust near the construction site.

The map shows a road closure on SW Washington Way between 17th and 26th Streets.

For questions or comments on this closure, contact Construction Manager Derek Bennett at 541-609-6111.

As part of the Washington Way Improvement project, Washington Way between 17th – 30th St. will be closed on Monday, March 6th. The 26th St. intersection will also be closed in all directions.

The east-west crosswalks at 26th St. will remain open for pedestrians. However, pedestrian access will be limited or unavailable at the north-south crosswalks throughout the day. Possible options are the Dixon driveway crossing and the Gill Colosseum crossing during the intersection work.

Other possible impacts include noise, dust and mud near the construction site.

The map shows a road closure on SW Washington Way from 17th to 30th St.

For questions or comments on this closure, contact Construction Manager Derek Bennett (541) 609-6111.

As part of the Washington Way Improvement project, the east-west pedestrian crosswalk on the north side of the intersection at 26th St. and Washington Way will be closed on Wednesday, March 1. The remaining three crosswalks on the east, west and south sides of the intersection will remain open for pedestrians.

The intersection will remain open to vehicle traffic throughout the day. Flaggers will be present to direct traffic and assist pedestrians. Other possible impacts include mud, dust and noise near the construction site.

A map shows the intersection of 26th St. and Washington Way with the north crosswalk closed and a pedestrian route marked along the east, west and south side of the intersection.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.