As part of the Owen Hall Renovation Project, scheduled fire alarm testing at Owen Hall will continue through Saturday, December 18, 2021 instead of the original date of Thursday, December 16, 2021.
For questions or comments on this work, contact Project Manager John Doty at 541-740-8302.
For work related to the Fairbanks Hall Renovation Project, planned power outages are scheduled for Tuesday, December 21, 2021 and will impact Langton, Moreland and Waldo halls. Pacific Power and Fortis Construction will coordinate and work to install a new vault, transformer, and feeds during the planned power outages.
For questions or comments on this work, contact Project Manager Amy Keene at 541-737-5312.
As part of the Graf Hall Renovation Project, a section of sidewalk along NW Monroe Ave. on the north side of Graf Hall will be closed for the removal of an underground storage tank near the building. The closure will be in place daily from 9 a.m. to 3 p.m. starting on Tuesday, December 14, 2021 through Thursday, December 16, 2021. Signage and flaggers will be provided when needed for intermittent street and sidewalk restrictions.
For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.
As part of the Graf Hall Renovation Project, the contractor for the project will be doing excavation work below the pedestrian bridge between Graf Hall and Rogers Hall. They will also be doing overhead steel work on the bridge. While this work is ongoing, pedestrian traffic in the area will be restricted. Work is scheduled to start on Monday, December 6, 2021 through Friday, December 10, 2021.
For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.
For work related to the Community Hall Slope Project, a planned water shutdown at the Valley Library is scheduled for Wednesday, December 15, 2021 from 7 a.m. to 4 p.m. Existing erosion control is in place around the work area.
For questions or comments about the water shutdown, contact Construction Manager Ryan Wilson at 503-779-3488.
Electrical reroute work related to the Completing Reser Stadium project is scheduled to start on Monday, December 6, 2021 through Sunday, December 19, 2021. There will be temporary parking lot impacts for the Reser Stadium Lot (lot #3281) and the Valley Football Center Lot (lot #3284). Thirteen standard parking spaces and six ADA spaces will be impacted. Alternative ADA parking spaces will be provided.
For questions or comments on this closure, contact Construction Manager Deena Magana at 541-737-8836.
The north sidewalk along SW Jefferson Avenue, between the Fairbanks Hall parking lot entry and the Austin Hall/Asian & Pacific Cultural Center fire lane/pathway will be closed for a short duration to accommodate a boring truck starting on the afternoon of Wednesday, December 1, 2021 through the end of the day on Friday, December 3, 2021.
Additionally, as part of the Fairbanks Hall Renovation Project, utility work continues. The sidewalk between the Women’s Building and Fairbanks Hall is scheduled to be closed through Monday, December 27, 2021 (view map). An area of the sidewalk/fire lane between Austin Hall and the Asian & Pacific Cultural Center will also be closed.
For questions or comments on this closure, contact Project Manager Amy Keene at 541-737-5312.
As part of the Fairbanks Hall Renovation Project, utility work will be happening. The sidewalk between the Women’s Building and Fairbanks Hall is scheduled to be closed from Monday, November 29 through Monday, December 27, 2021. An area of the sidewalk/fire lane between Austin Hall and the Asian & Pacific Cultural Center will also be closed.
For work related to the Completing Reser Stadium project, the west area of the Reser Stadium lot (lot #3281) will be closed from Monday, November 22, 2021 through Friday, December 10, 2021. Exterior sawcutting work is scheduled for an electrical reroute.
An extended closure for the west area of the Reser Stadium lot is also scheduled starting Monday, November 22, 2021 through Thursday, June 15, 2023. The area will be used for a contractor jobsite and temporary storage space.
For questions or comments on this closure, contact Construction Manager Deena Magana at 541-737-8836.
As part of the Merryfield Hall Renovation project, two accessible parking spaces in parking lot #3221 will be temporarily closed so that building materials can be placed on the roof of Merryfield Hall. A lift will be set up in the area. This temporary closure will also impact the drive aisle between Merryfield Hall and Graf Hall. Work is scheduled from 8 a.m. to 3 p.m. on Thursday, November 18, 2021.
For questions or comments on this closure, contact Project Manager David Amundson at 541-737-2760.