As part of the Richardson Hall Controls project, a crane will be working in the Forest Science Lab parking lot on Thursday, June 13 from 8 A.M. to 3 P.M. Ten parking spaces will be closed during this time frame. The west entrance of Richardson Hall will be closed intermittently while the crane is operating.

Other possible impacts include noise near the worksite.

A map showing a parking space closure and crane location at the east side of the Forest Science Lab parking lot near Richardson Hall.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, SW Campus Way between SW 26th St. and SW Memorial Place will be closed starting Wednesday, May 29 through Monday, June 10.  The closure is necessary to allow for crane activity related to the project. Unlike recent, intermittent closures related to the project, this will be a continuous closure of Campus Way.

The Kelley Engineering Center south entrance will also be closed.

A map showing a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians.

The north sidewalk and both bicycle lanes in this section of Campus Way will be closed during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.

A map showing a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

This is an update to a previous notification.

The crane work on SW Memorial Place near Kelley Engineering Center has been completed and the street, parking spaces and sidewalk will reopen on Tuesday, May 21 at 4 P.M.  

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelley District Utility Plant project, SW Memorial Place will be closed between Kelley Engineering Center and Plageman Hall from Tuesday, May 21 through Wednesday, May 22 to allow for crane activity.

The street parking spaces in this section of Memorial Place will also be closed.

The west sidewalk on Memorial Place will be closed from Campus Way to Plageman Hall. The east sidewalk will remain open as a detour.

The Kelley Engineering center east entrance will remain open.

Other possible impacts include noise near the work site.

A map of SW Memorial Place showing a road closure between Kelley Engineering Center and Plageman Student Health Center. The west sidewalk is marked as closed from SW Campus Way to Plageman Student Health Center. The east entrance to Kelley Engineering Center is marked as open.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

This is an update on the  Jen-Hsun Huang & Lori Mills Huang Collaborative Innovation Complex.

Truck traffic and activity will increase on SW 26th St. from SW Western Blvd. to NW Monroe Ave. on Monday, May 13 and Tuesday, May 14. Construction will begin on a tower crane that will be built within the fenced construction site and operate throughout the duration of the project.

What to know about the tower crane

The tower crane will be actively working on a daily basis in a highly visible location. While the crane boom radius does extend over Monroe Ave., the CEOAS Admin Building and Johnson Hall, crane loads will NOT be lifted over these areas for safety reasons.

When the crane is unmanned and inactive, building occupants and those in the surrounding area may notice the crane boom swinging back and forth in a freely moving, “weathervane” state. While this may appear concerning, it is actually an important safety requirement that allows the crane to remain stable in windy conditions.

For questions or comments on this closure, contact Construction Manager Jason Lundy at (541) 270-0193.

Please note: this will NOT be a continuous closure. Expect to see multiple, short-term closures, with the area being reopened for use in between. These short-term closures will be ongoing through June 8.

As part of the Kelley District Utility Plant project, intermittent closures will occur on Campus Way between 26th St. and Memorial Place, starting Monday April 22 through Saturday, June 8. The closures are necessary to allow for crane activity related to the project.

The Kelley Engineering Center south entrance will also be closed.

The north sidewalk and both bicycle lanes in this section of Campus Way will be closed intermittently during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.

The map shows a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians.
The map shows a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

This is a preliminary notification regarding upcoming closures on Campus Way.

Please note: this will NOT be a continuous, long-term closure. Expect to see multiple, short-term closures, with the area being reopened for use in between. A Campus Notification will be sent out for each closure, noting the specific dates and durations.

As part of the Kelley District Utility Plant project, intermittent closures will occur on Campus Way between 26th St. and Memorial Place, near Kelley Engineering Center. The closures are necessary to allow for crane activity related to the project. The closures will occur starting on Monday, April 22 through Saturday, June 8.

The north sidewalk and both bicycle lanes in this section of Campus Way will be closed intermittently during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.

The Kelley Engineering Center south entrance will also be closed.

The map shows a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians.
The map shows a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Kelly District Utility Plant project, Campus Way will be closed between 26th St. and Memorial Place starting Tuesday, March 12 through Friday, March 15 to allow for crane activity. The south entrance of Kelley Engineering Center will be closed.

The north sidewalk in this section of Campus Way will be closed to pedestrians. The south sidewalk will remain open as a detour.

The map shows a road and sidewalk closure on Campus Way between 26th St. and Memorial Place. The roadway is marked as closed. The south entrance at Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open.

Bicycle lanes in this section of Campus Way will be closed in both directions. A bicycle detour will be available along the walkway on the south side of Milam Hall.

The map shows a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

As part of the Beth Ray Solar project, SW Stadium Ave. will be closed on the south side of the Beth Ray Center on Friday, February 9 from 6:00 – 7:30 A.M. to allow for crane activity. The road closure will be located between the Beth Ray Center and CH2M HILL Alumni Center.

The sidewalks on both sides of Stadium Ave. will also be closed along with two reserved parking spots, the loading dock and the dumpster access area on the south side of the street.

The map shows a road closure on SW Stadium Ave. between the Beth Ray Center and CH2M HILL Alumni Center. The sidewalks on both sides of Stadium Ave. are marked as closed along with two reserved parking spaces, the loading dock and the dumpster access area on the south side of the street.

For questions or comments on this closure, contact Construction Manager Liz Roach at (701) 371-2938.