As part of the Washington Way Improvement project, Washington Way between 17th & 26th streets will be closed to vehicle traffic to allow for storm drain installation. Pedestrian access will be maintained along the walkway on the south side of Washington Way.

Other possible impacts include dust, mud and noise near the construction site.

For questions or comments on this closure, contact Construction Manager Derek Bennett (541) 609-6111.


As part of the Pride Center Renovation project, SW May Avenue between Adams Hall and the Pride Center will be closed on Monday, January 30th from 8:00AM – 1:00PM for tree removal. This closure will impact the 15th St. entrance to the parking lot located on the corner of SW 17th St. and SW A Ave. However, all other entrances to the parking lot will remain open. Please see map for alternate routes.

Other possible impacts include disruptive noise near the worksite. For questions or comments on this closure, contact Construction Manager Scylise Little.


As part of the Washington Way Improvement project, Washington Way between 17th & 26th streets will be closed to vehicle traffic to allow for storm drain installation. Pedestrian access will be maintained along the walkway on the south side of Washington Way.

Other possible impacts include dust, mud and noise near the construction site.

For questions or comments on this closure, contact Construction Manager Derek Bennett (541) 609-6111.

As part of the Washington Way Improvement project, Washington Way between 17th – 26th streets and 26th– 30th streets will be closed for water line installation/testing and paving (weather permitting). North-South access at the intersections of 17th & 26th will remain open.

Expected impacts include noise, construction dust and mud near the site.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

New Effective Date: Monday, December 19th, 2022 from 8 a.m. – 5 p.m.

Due to weather conditions and employee training needs at the asphalt plant, the closure of Washington Way between 17th & 26th Street planned for Friday, December 16th has been postponed until Monday, December 19th from 8 a.m. – 5 p.m.

For further information about the Washington Way Improvement Project, click here.

Washington Way Construction Impacts 12/12-12/16

For questions or comments on this closure, contact Construction Manager Derek Bennett at 541-609-6111. 

Emergency Street Shutdown Westbound lane at the intersection of 30th and Washington Way due to an apparent water main break. The City of Corvallis has been contacted and is en route to repair, unknown time of restoration.  Additional lane closures could occur as the work progresses. Magruder Hall will experience reduced water pressure while this repair is being performed.