This is an update to a previous notification.

As part of the Washington Way Improvement project, SW Washington Way between SW 26th & SW 30th Streets will be closed through Tuesday, September 5. In addition, SW 26th St. will be closed between SW Ralph Miller Lane and SW Intramural Lane.

The south and west crosswalks at the intersection of 26th St. and Washington Way will remain open during this closure. The crosswalk on 26th St. at the OSU Beaver Store will also remain open.

A section of the east sidewalk on 26th St., near Dixon Recreation Center, will be closed. Pedestrians may use the west sidewalk, across from Dixon, to detour around the work site. The crosswalk on 26th St. at the entrance to Dixon will also remain open.

The map shows a road closure on SW Washington Way, between SW 26th and SW 30th Streets and a road closure on SW 26th Street, between SW Ralph Miller Lane and SW Intramural Lane. Washington Way is also marked as closed between SW 17th and SW 26th Streets.
The map shows a pedestrian access route along the south and west sides of the intersection at SW 26th St. and SW Washington Way. The route extends north along the west sidewalk and across 26th St. at the crosswalk in front of Dixon Recreation Center. A section of the east sidewalk on 26th St., just south of Dixon, is marked as closed.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609 – 6111.

As part of the LaSells Stewart Center Mechanical and Roof Renewal project, a section of the northbound lane on SW 26th St., between SW Western Blvd. and The LaSells Stewart Center, will be closed to allow for crane activity on Thursday, August 31 from 7 A.M. to 2 P.M. Flaggers will be present in the area to direct traffic.

In addition, a section of the sidewalk on the east side of 26th St. will be closed along with the crosswalk near the front entrance and the walkway on the north side of The LaSells Stewart Center. The west sidewalk will remain open for pedestrians.

The map shows a closure in the northbound lane on SW 26th Street, in front of The LaSells Stewart Center. A section of the east sidewalk, between SW Western Blvd. and the CH2M HILL Alumni Center, is marked as closed. The crosswalk near the front entrance of The LaSells Stewart Center is marked as closed.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

This is an update to a previous notification.

This update is to clarify pedestrian access on SW Washington Way and SW 26th St. during the closure scheduled for Monday, August 28 through Friday, September 1.

The south and west crosswalks at the intersection of SW 26th St. and SW Washington Way will remain open during this closure. The crosswalk on 26th St. at the OSU Beaver Store will also remain open.

A section of the east sidewalk on 26th St., near Dixon Recreation Center, will be closed. Pedestrians may use the west sidewalk, across from Dixon, to detour around the work site. The crosswalk on 26th St., at the entrance to Dixon, will also remain open.

The map shows a pedestrian access route along the south and west sides of the intersection at SW 26th St. and SW Washington Way. The route extends north along the west sidewalk and across 26th St. at the crosswalk in front of Dixon Recreation Center. A section of the east sidewalk on 26th St., just south of Dixon, is marked as closed.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609 – 6111.

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind The LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, August 25 from 7 A.M. to 3:30 P.M. The B2 parking lot east of The LaSells Stewart Center will also be closed. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave. directly behind The LaSells Stewart Center will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot. 

The map shows a road closure on SW Stadium Ave. directly behind The LaSells Stewart Center. The east and west sidewalks on Stadium Ave., behind The LaSells Stewart Center, are also marked as closed. The LaSells Stewart Center East parking lot is marked as closed. A vehicle detour is marked from SW Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.  

As part of the Kerr South Parking Lot project, SW 15th St. will be closed in both directions between SW Washington Ave. and SW Jefferson Way. This closure will be in effect from Tuesday, August 22 until Tuesday, September 5.

The crosswalk at 15th St. and Washington Ave. will also be closed along with the east sidewalk between Washington Ave. and SW Adams Ave. Please refer to the pedestrian detour information below.

Please note: SW Washington Way is currently closed between SW 15th St. and SW 26th St., which means that SW Benton Place will not be accessible as a north-south detour option.

Vehicle detour: SW Washington Ave., to SW 11th St. to SW Jefferson Way.

The map shows a closure on SW 15th St. between SW Washington Ave. and SW Jefferson Way. It shows a vehicle detour along Washington Ave. to SW 11th St. to Jefferson Way.

Pedestrian detour: take the north sidewalk on Washington Ave. to the walkway along SW 14th St. Proceed across Adams Ave. to the north sidewalk and continue along the east sidewalk on SW 15th St.

The map shows road closure on SW 15th St. between SW Washington Ave. and SW Jefferson Way. A pedestrian detour route is marked along the north side of Washington Ave. to the walkway on SW 14th St. to the north sidewalk on SW Adams Ave. to the east sidewalk along 15th St.

Please note: the west sidewalk along SW 15th St. is currently unavailable due to a separate closure related to this project.

For questions or comments on this closure, contact Construction Manager Derek Bennett at (541) 609-6111.

As part of the Memorial Union Roof & Gutter project, the sidewalk on the north side of SW Jefferson Way, directly in front of Memorial Union, will be intermittently closed on Tuesday, August 15 from 6 A.M. to 1 P.M. to allow for crane activity.The south sidewalk will remain open for pedestrians.

Additionally, the loading zone and 30-minute parking spaces on Jefferson Way, in front of Memorial Union, will also be closed.  The street will remain open for vehicle traffic.

The map shows a sidewalk closure in front of Memorial Union, on the north side of SW Jefferson Way. The area is marked as intermittently closed.

For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.

As part of the LaSells Stewart Center Mechanical and Roof Renewal project, a section of the northbound lane on SW 26th St., between SW Western Blvd. and the CH2M HILL Alumni Center, will be closed to allow for crane activity on Wednesday, August 9 from 7  A.M. to 11 A.M. Flaggers will be present in the area to direct traffic.

In addition,  a section of the sidewalk on the east side of 26th St. will be closed along with the crosswalk near the front entrance and the walkway on the north side of The LaSells Stewart Center. The west sidewalk will remain open for pedestrians.

The map shows a northbound lane closure on SW 26th St., between SW Western Blvd. and the CH2M HILL Alumni Center. The crosswalk near The LaSells Stewart Center's front entrance and the walkway along the north side of the building are also marked as closed.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of the Patricia Valian Reser Center for the Creative Arts project, the sidewalk on the west side of SW 15th St. will be closed between SW Washington Way and SW Jefferson Way. The closure will be in effect from Monday, August 7 through Friday, August 18. Pedestrians may detour across 15th St. using the crosswalks at Washington Way or Jefferson Way and use the east sidewalk.

This notice is in addition to a separate sidewalk closure in the area associated with the Kerr South Parking Lot project (see previous notification).

The map shows a sidewalk closure on SW 15th St., between SW Washington Way and SW Jefferson Way. A pedestrian detour across 15th St. is marked at the crosswalks located at Washington Way and Jefferson Way.

For questions or comments on this closure, contact Construction Manager Trevor Ritchie at (503) 730-0771.

As part of the Washington Way Improvement project, SW Washington Way between SW 15th and SW 26th Streets will be closed to vehicle traffic from Monday, August 7 through Thursday, September 7. This is an update to the existing Washington Way closure.

In addition, the intersection and crosswalks at Washington Way and SW 17th St. will be closed. The sidewalk on the north side of Washington Way between 15th St. and SW Benton Place will also be closed. The multi-use path on the south side of Washington Way will remain open as a pedestrian detour.

Other possible impacts include noise, dust and mud near the work site.

The map shows a marked section of SW Washington Way between SW 15th St. and SW 26th Street.

For questions or comments on this closure, contact Project Manager Aaron Amoth at (541) 207-5084.

As part of the LaSells Stewart Center Mechanical & Roof Renewal Project, a section of SW Stadium Ave. located directly behind The LaSells Stewart Center and just south of Bloss Hall will be closed to allow for crane activity on Friday, August 4 from 7 A.M. to 3:30 P.M. The B2 parking lot east of The LaSells Stewart Center will also be closed. The entrance to SW Stadium Ave. from SW Western Blvd. will be closed. Both the east and west sidewalks on Stadium Ave. directly behind The LaSells Stewart Center will be closed. A vehicle detour will be available from Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot. 

The map shows a road closure on SW Stadium Ave. directly behind The LaSells Stewart Center. The east and west sidewalks on Stadium Ave., behind The LaSells Stewart Center, are also marked as closed. The LaSells Stewart Center East parking lot is marked as closed. A vehicle detour is marked from SW Western Blvd. along the east and north side of the LaSells Stewart Center East parking lot.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.