As part of the West Greenhouse Improvement project, a section of the westbound lane on SW Campus Way will be closed along with the north sidewalk on Tuesday, March 21 from 7 a.m. – 12 p.m. The section affected is located between SW 30th and SW 35th Streets, just west of the greenhouses. Drivers should expect to see flagging crews in the area. Pedestrians may travel along the north or south sidewalk and then detour across SW Campus Way at the crosswalk located at the Seed Laboratory. Other possible impacts include noise, dust and mud near the construction site.

Two maps are shown. The first map shows a pedestrian detour route on Campus Way between 30th and 35th Streets. The detour runs from the intersection with 30th St. along the south sidewalk of Campus Way. The route crosses Campus Way via a crosswalk at the Seed Laboratory and proceeds down the north sidewalk to 35th St. The second map shows a vehicle detour on Campus Way between 30th and 35th streets. A section of the westbound lane is shown as closed between the greenhouses and the Seed Laboratory.

For questions or comments on this closure, contact Construction Manager Scylise Little.

Print Friendly, PDF & Email

Comments are closed.