
OSU & partner products
Project status. We are currently moving towards 30% cost engineering for a flushing channel. Want to learn more about how we got here?
Tullos, D., Skinner, M.M., Paerl, H.W. and Preece, E.P. (2025) A Practitioner-Informed Decision Tree for Selecting Harmful Cyanobacteria Bloom Control and Mitigation Techniques. WIREs Water, 12: e70005. https://doi.org/10.1002/wat2.70005
Tullos and Chavis (2024) HCB Management Plan
Tullos et al. (2024) Ross Island Lagoon Story Map
Ross Island Lagoon Field Data Library
Fat Pencil (2024) Aerial view animation of flushing channel
OMSI (2023) Presentation | Treating the Harmful Cyanobacteria Bloom (HCB) at Ross Island Lagoon
OMSI (2024) Presentation | HCB Management Plan for Ross Island Lagoon
Regulations & Reclamation documents
ODEQ Final Site Investigation Report Review Letter from DEQ (2001)
DSL Reclamation Plan Section 4: Reclamation Goals and Strategies (2002)
ODEQ No Further Action Memo (2011)
ODEQ Ross Island Sand and Gravel 401 Water Quality Certification (2017)
ODEQ Ross Island Fill Evaluation Fact Sheet (2022)
2020 Reclamation Plan Adaptive Management Permit Application



Ecology & Vision
telemetric data | project directives | soil samples
Hart Crowser Reports
Other Resources
Houck M, Frank C, Medeiros M, Sallinger B, Faha M, Williams T. (n.d.) Envisioning Ross Island

Other reports
modeling reports | sediment transport | assessments
West Consultants Inc. (2004) Hydrodynamics/sedimentation modeling for the Lower Willamette River
Northwest Hydraulic Consultants Inc. (2010) No-rise Analysis for Zidell Property Remediation Project
Herrera Environmental Consultants. (2023) Vancouver Lake Management Plan. Draft.