As noted in last week, the brink CMU for the new clinic will continue on this week. At the lecture hall site, the concrete slab will be pour this week.
Around the other side of Magruder Hall, Fortis will be putting together and installing the forms that will later be filled with concrete. Lastly, the continuation of electrical piping inside the existing sections of Magruder Hall will continue. This will later be used to tie-in the new sections of the building into the existing electrical system to be centrally controlled.
A new 4 week schedule can be found under the schedule tab at the top of the page, and additional photos of this weeks progress will be posted under the photos.