** Maintenance Announcement – ESXi is being upgraded to 6.5**

We are updating our entire compute fleet from ESXi versions 5.5.0u2 or 6.0.0u3 to ESXi 6.5.0u1. We do not anticipate any downtime. However we will be causing a significant number of vMotion events and will be running at a higher density then normal. If you have over provisioned VMs you may experience some short term disruptive behavior, though the VMs should recover after a few seconds.

Start: 4/24/2018

End: 5/4/2018

If you have questions or concerns about this maintenance, please contact the Shared Infrastructure Group at osu-sig (at) oregonstate.edu or call 737-7SIG.

** Maintenance Announcement – No service interruption anticipated **

We will be applying the latest stable maintenance release firmware for our Arista switch pair in our primary storage & compute POD. We do not anticipate any customer noticeable downtime.

Start: 11/28/2015 10:00:00 PM

End: 11/28/2015 11:00:00 PM

If you have questions or concerns about this maintenance, please contact the Shared Infrastructure Group at osu-sig (at) oregonstate.edu or call 737-7SIG.

We will be working with noc to add vlans 300 to our blade centers trunk. This will be done to one trunk port at a time, and one data center at a time.

Start Time: 8/26/2014 at 10:00 pm

End Time: 8/26/2014 at 11:30 pm

If you have any questions or concerns about this maintenance, please contact OSU-SIG ( at ) oregonstate.edu or call 7-7sig

We will be working with noc to add vlans 87 and 471 to our blade centers trunk. This will be done to one trunk port at a time, and one data center at a time.

Start Time: 8/9/2014 at 10:00 pm

End Time: 8/9/2014 at 11:30 pm

If you have any questions or concerns about this maintenance, please contact OSU-SIG ( at ) oregonstate.edu or call 7-7sig

We will be working with noc to add vlans 22 to our blade centers trunk. This will be done to one trunk port at a time, and one data center at a time.

Start Time: 3/15/2014 at 10:00 pm

End Time: 3/15/2014 at 11:30 pm

If you have any questions or concerns about this maintenance, please contact OSU-SIG ( at ) oregonstate.edu or call 7-7sig

We will be working with noc to add vlan 3841 to our blade center’s trunk. This will be done to one trunk port at a time, and one data center at a time.

Start Time: 10/29/13 at 10:00 pm

End Time: 10/29/13 at 11:30 pm

If you have any questions or concerns about this maintenance, please contact OSU-SIG ( at ) oregonstate.edu or call 7-7sig

We will be working with noc to add vlans164 and 864 to our blade center’s trunk. This will be done to one trunk port at a time, and one data center at a time.

Start Time: 10/08/13 at 09:00 pm

End Time: 10/08/13 at 10:30 pm

If you have any questions or concerns about this maintenance, please contact OSU-SIG ( at ) oregonstate.edu or call 7-7sig

 

We will be working with noc to add vlans14, 19,186,807,882 to our blade centers trunk. This will be done to one trunk port at a time, and one data center at a time.

Start Time: 9/07/13 at 10:00 pm

End Time: 9/07/13 at 11:30 pm

If you have any questions or concerns about this maintenance, please contact OSU-SIG ( at ) oregonstate.edu or call 7-7sig

 

This last Monday we experienced two more pages for downed events for one of our switches one at 8am and one at 5pm. This did not impact service but is troubling as we want everything to be healthy all the time in our environment. For a description of the problem we are seeing take a look at my earlier blog post and its follow up.

I put in a support call to HP and referenced the older ticket and the repeat of the problem. Support requested a copy of the output from each switch from the command show tech all. I dumped the output and sent it off to the helpful support person. Later that day the support person called back and asked about why were were on such a new version of the firmware! So I pointed out that it was their support whom gave us the copy of the firmware and told us to run it. At the end of this support call HP has come back with two changes. They would like us to add loop protect on the ports that feed our blade centers. They would also like us to reconfigure both switch2s in each site so that their trunk ports are statically defined instead of auto-detected/dynamic.

So our next maintenance window is this Saturday and we will perform the following changes:

All switches will get:

config
loop-protect mode port
loop-protect a2
write mem
exit

Each switch2 will get (where ? is 1 for site1 and 2 for site2):

config
no interface <port list> lacp
trunk <port list> trk? lacp
write mem
exit

Part 1 | Part 1 follow up | Part 2 | Part 3 | Part 4

** Maintenance Announcement – No service interruption anticipated **

We will be applying a configuration change to our iSCSI switches that support our StoreVirtual SAN. This is the storage network that back’s our VMware infrastructure.

We do not anticipate any service interruption. Our switching is redundant, we will only change the switches one at a time, and the changes should not be service interrupting.

Start: 05/18/2013 10:00 PM

End: 05/18/2013 11:00 PM

If you have questions or concerns about this maintenance, please contact the Shared Infrastructure Group at osu-sig (at) oregonstate.edu or call 737-7SIG.