** Maintenance Announcement – DEV VM service interruption anticipated **
We are upgrading our 2910al-24g switches to the latest firmware. During the upgrade of the switch that provides the storage for the DEV VMware cluster will be unavailable, as such the Dev VMware cluster will also be shut down.
Production SANs are redundantly connected and maintenance will have no noticeable effect on these SANs, meaning that the OSU systems used by students, staff, and faculty will not experience a service interruption.
Start: 04/20/2013 at 9:00 PM
End: 04/20/2013 at 11:59 PM
If you have questions or concerns about this maintenance, please contact the Shared Infrastructure Group at osu-sig (at) oregonstate.edu or call 737-7SIG.