Weekly Update: 7/22-7/26

At the Clinic, the metal panels at the connector will be installed. As well as, the windows and those glass glazing throughout the clinic and the cabinetry will also be getting installed this week. The second floor of the clinic will also see sheetrock and framing and the mechanical, electrical and plumbing rough-ins.

The lobby will have framing going up to tie-in the existing lobby to the new addition. The lobby will also be getting its roof and having the concrete slab poured-back.

The lecture hall will have the exterior site prepped and inside the concrete will be getting a nice polish.

the mechanical, electrical, and plumbing rough-ins continue at LINAC and the finishing on the walls will be going up.

Outside in the parking lot, concrete pours will continue for curbs and sidewalks.

Print Friendly, PDF & Email

Leave a Reply

Your email address will not be published. Required fields are marked *