Big Changes 10/29 through 11/2

The Clinic 

On the clinic site, this week the concrete masonry units (CMU) will begin to be installed. CMU blocks are often one of the most versatile materials on site and chosen by many architects and engineers.

CMU blocks can provide:

  • Structural Aid
  • Fire Safety
  • Sound Control
  • many other non-construction related uses

Demo to the existing clinic exterior will also begin in order for the steel ties to be connected to adjoin the two buildings.

The Lecture Hall

This week, many activities will take place in progress of the new lecture hall! Our Fortis Crew will be installing rebar and electrical rough in for the preparation oh the slab on grade (SOG) concrete pour, which will also be taking place this week. The slab on grade concrete pour will  essentially set the base in which the rest of the lecture hall will be built around.

LINAC

Finally this week, the grade compaction for the LINAC addition will be completed. Above, you can see the grade compaction work from Friday 10/26.

Please check out Photos and Schedule for additional updates!