{"id":8829,"date":"2025-07-08T23:01:03","date_gmt":"2025-07-08T23:01:03","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=8829"},"modified":"2025-07-08T23:01:03","modified_gmt":"2025-07-08T23:01:03","slug":"7-14-permenant-b2-parking-lot-closures-near-bloss-hall-lasells-stewart-center","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2025\/07\/08\/7-14-permenant-b2-parking-lot-closures-near-bloss-hall-lasells-stewart-center\/","title":{"rendered":"7\/14 &#8211; Permenant B2 Parking Lot Closures Near Bloss Hall &amp; LaSells Stewart Center"},"content":{"rendered":"\n<p>As part of the <a href=\"https:\/\/ufio.oregonstate.edu\/project-delivery\/corvallis-campus-housing-and-dining-vision-phase-1\" target=\"_blank\" rel=\"noreferrer noopener\">Corvallis Campus Housing and Dining Vision project<\/a>, three B2 parking lots located between Bloss Hall, the LaSells Stewart Center and the CH2M Hill Alumni Center will be <strong>permanently closed starting on Monday, July 14. <\/strong>The closure area includes the roadway and sidewalks on SW Stadium Ave. between SW Western Blvd. and Bloss Hall.<\/p>\n\n\n\n<p>This closure is needed to accommodate construction of a new residence hall. <strong>Please see the <a href=\"https:\/\/ufio.oregonstate.edu\/project-delivery\/corvallis-campus-housing-and-dining-vision-phase-1\" target=\"_blank\" rel=\"noreferrer noopener\">project webpage<\/a> for details. <\/strong>Construction will continue on this project through summer 2027. SW Stadium Ave. will be reopened to allow access to the OSU parking garage from SW Western Blvd. for game days and other preplanned events.<\/p>\n\n\n\n<p><strong>The following parking lots will be closed:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>3259 \u2013 LaSells Stewart Center East Lot<\/li>\n\n\n\n<li>3270 \u2013 Bloss Hall South Lot<\/li>\n\n\n\n<li>3273 \u2013 Bloss Hall West Lot<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?ssl=1\" target=\"_blank\" rel=\" noreferrer noopener\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"444\" data-attachment-id=\"8830\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2025\/07\/08\/7-14-permenant-b2-parking-lot-closures-near-bloss-hall-lasells-stewart-center\/7-14-uhds-housing-vision\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?fit=1408%2C812&amp;ssl=1\" data-orig-size=\"1408,812\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"7.14 UHDS Housing Vision\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?fit=770%2C444&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?resize=770%2C444&#038;ssl=1\" alt=\"A map showing the planned location of a residence hall. \" class=\"wp-image-8830\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?resize=1024%2C591&amp;ssl=1 1024w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?resize=300%2C173&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?resize=768%2C443&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/07\/7.14-UHDS-Housing-Vision.jpg?w=1408&amp;ssl=1 1408w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact Project Managers <a href=\"mailto:Doty,%20John%20Matthew%20%3cjohn.doty@oregonstate.edu%3e\" target=\"_blank\" rel=\"noreferrer noopener\">John Doty<\/a>, (541) 737-5302 or <a href=\"mailto:Bettencourt,%20Dale%20%3cdale.bettencourt@oregonstate.edu%3e\" target=\"_blank\" rel=\"noreferrer noopener\">Dale Bettencourt<\/a>, (541) 207-7860.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the Corvallis Campus Housing and Dining Vision project, three B2 parking lots located between Bloss Hall, the LaSells Stewart Center and the CH2M Hill Alumni Center will be permanently closed starting on Monday, July 14. The closure area includes the roadway and sidewalks on SW Stadium Ave. between SW Western Blvd. and&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2025\/07\/08\/7-14-permenant-b2-parking-lot-closures-near-bloss-hall-lasells-stewart-center\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":13074,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[211854,211864,211853,1291526],"tags":[],"class_list":["post-8829","post","type-post","status-publish","format-standard","hentry","category-parking-lot-closure","category-sidewalk-closure","category-streetroadway-closure","category-uhds-campus-housing-dining-vision"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/13074"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=8829"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8829\/revisions"}],"predecessor-version":[{"id":8831,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8829\/revisions\/8831"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=8829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=8829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=8829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}