{"id":8595,"date":"2025-03-17T17:09:33","date_gmt":"2025-03-17T17:09:33","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=8595"},"modified":"2025-03-17T17:10:07","modified_gmt":"2025-03-17T17:10:07","slug":"spring-summer-city-pipeline-work-on-sw-35th-western-blvd-starts-this-month","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2025\/03\/17\/spring-summer-city-pipeline-work-on-sw-35th-western-blvd-starts-this-month\/","title":{"rendered":"Spring\/Summer City Pipeline Work on SW 35th\/Western Blvd. Starts This Month"},"content":{"rendered":"\n<p><strong>Important \u2013 please read carefully for information regarding construction impacts over the next several months.<\/strong><\/p>\n\n\n\n<p>The city of Corvallis will be conducting a <a href=\"https:\/\/www.corvallisoregon.gov\/publicworks\/page\/water-pipeline-infrastructure-project-starts-march\" target=\"_blank\" rel=\"noreferrer noopener\">long-term construction project<\/a> to replace a water pipeline on SW 35<sup>th<\/sup> St. and SW Western Blvd. Work is slated to begin at the end of March and is expected to continue over the summer.<\/p>\n\n\n\n<p>The city plans to begin work on SW Western Blvd. and then move to SW 35<sup>th<\/sup> St. later this spring. Along with the new water pipeline, the city will be improving pedestrian crossings, adding buffered bike lanes in some sections of roadway and repaving both streets. <\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?ssl=1\" target=\"_blank\" rel=\" noreferrer noopener\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"341\" data-attachment-id=\"8596\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2025\/03\/17\/spring-summer-city-pipeline-work-on-sw-35th-western-blvd-starts-this-month\/35th-western-construction-work\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?fit=1433%2C635&amp;ssl=1\" data-orig-size=\"1433,635\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"35th Western Construction Work\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?fit=770%2C341&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?resize=770%2C341&#038;ssl=1\" alt=\"A map showing work zones on SW Western Blvd. and SW 35th St. \" class=\"wp-image-8596\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?resize=1024%2C454&amp;ssl=1 1024w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?resize=300%2C133&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?resize=768%2C340&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2025\/03\/35th-Western-Construction-Work.jpg?w=1433&amp;ssl=1 1433w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>The Corvallis Public Works Department stated that detours for vehicles would be in place for road closures and any disruptions in water service would be communicated to affected buildings 48 hours in advance. Local access to residences, businesses and other buildings will be maintained during this project.<\/p>\n\n\n\n<p>Once the city\u2019s construction schedule is finalized, notifications regarding campus road closures and other impacts will be available on the <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/\" target=\"_blank\" rel=\"noreferrer noopener\">Campus Notifications blog<\/a>, where subscribers can receive updates via email.&nbsp;<\/p>\n\n\n\n<p>Beaver Bus riders can find updates on detours and route changes by visiting the <a href=\"https:\/\/transportation.oregonstate.edu\/beaver-bus\/beaver-bus-route-changes\" target=\"_blank\" rel=\"noreferrer noopener\">Beaver Bus Route Changes<\/a> or the <a href=\"https:\/\/osushuttles.com\/routes\" target=\"_blank\" rel=\"noreferrer noopener\">Beaver Bus Tracker<\/a> pages.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Important \u2013 please read carefully for information regarding construction impacts over the next several months. The city of Corvallis will be conducting a long-term construction project to replace a water pipeline on SW 35th St. and SW Western Blvd. Work is slated to begin at the end of March and is expected to continue over&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2025\/03\/17\/spring-summer-city-pipeline-work-on-sw-35th-western-blvd-starts-this-month\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":13074,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[655979,211853],"tags":[],"class_list":["post-8595","post","type-post","status-publish","format-standard","hentry","category-city-of-corvallis","category-streetroadway-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/13074"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=8595"}],"version-history":[{"count":2,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8595\/revisions"}],"predecessor-version":[{"id":8598,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8595\/revisions\/8598"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=8595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=8595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=8595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}