{"id":8167,"date":"2024-08-29T23:07:42","date_gmt":"2024-08-29T23:07:42","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=8167"},"modified":"2024-08-29T23:07:42","modified_gmt":"2024-08-29T23:07:42","slug":"9-3-9-20-campus-way-closed-between-26th-street-memorial-place","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2024\/08\/29\/9-3-9-20-campus-way-closed-between-26th-street-memorial-place\/","title":{"rendered":"9\/3 \u2013 9\/20: Campus Way Closed Between 26th Street &amp; Memorial Place"},"content":{"rendered":"\n<p>As part of the\u00a0<a href=\"https:\/\/fa.oregonstate.edu\/project-delivery\/kelley-district-utility-plant\" target=\"_blank\" rel=\"noreferrer noopener\">Kelley District Utility Plant project<\/a>, SW Campus Way between SW 26<sup>th<\/sup>\u00a0St. and SW Memorial Place will be closed\u00a0<strong>starting Tuesday, September 3 through Friday, September 20.<\/strong>\u00a0\u00a0The closure is necessary to allow for crane activity related to the project. <\/p>\n\n\n\n<p>The Kelley Engineering Center south entrance will also be closed.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?ssl=1\" alt=\"\" \/><\/figure>\n\n\n\n<p>The north sidewalk and both bicycle lanes in this section of Campus Way will be closed during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?ssl=1\" alt=\"\" \/><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Project Manager <a href=\"mailto:mailto:%20Scott.Bond@oregonstate.edu\">Scott Bond<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the\u00a0Kelley District Utility Plant project, SW Campus Way between SW 26th\u00a0St. and SW Memorial Place will be closed\u00a0starting Tuesday, September 3 through Friday, September 20.\u00a0\u00a0The closure is necessary to allow for crane activity related to the project. The Kelley Engineering Center south entrance will also be closed. The north sidewalk and both&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2024\/08\/29\/9-3-9-20-campus-way-closed-between-26th-street-memorial-place\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3122,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1291490,1291417],"tags":[],"class_list":["post-8167","post","type-post","status-publish","format-standard","hentry","category-campus-way","category-road-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/3122"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=8167"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8167\/revisions"}],"predecessor-version":[{"id":8168,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/8167\/revisions\/8168"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=8167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=8167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=8167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}