{"id":7760,"date":"2024-05-22T22:01:24","date_gmt":"2024-05-22T22:01:24","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=7760"},"modified":"2024-05-22T22:01:24","modified_gmt":"2024-05-22T22:01:24","slug":"5-29-6-10-campus-way-closed-between-26th-street-memorial-place","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2024\/05\/22\/5-29-6-10-campus-way-closed-between-26th-street-memorial-place\/","title":{"rendered":"5\/29 &#8211; 6\/10: Campus Way Closed Between 26th Street &amp; Memorial Place"},"content":{"rendered":"\n<p>As part of the <a href=\"https:\/\/fa.oregonstate.edu\/project-delivery\/kelley-district-utility-plant\" target=\"_blank\" rel=\"noreferrer noopener\">Kelley District Utility Plant project<\/a>, SW Campus Way between SW 26<sup>th<\/sup> St. and SW Memorial Place will be closed <strong>starting Wednesday, May 29 through Monday, June 10.<\/strong> \u00a0The closure is necessary to allow for crane activity related to the project. Unlike recent, intermittent closures related to the project, this will be a continuous closure of Campus Way.<\/p>\n\n\n\n<p>The Kelley Engineering Center south entrance will also be closed.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"420\" data-attachment-id=\"7761\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2024\/05\/22\/5-29-6-10-campus-way-closed-between-26th-street-memorial-place\/5-29-kdup-campus-way-closure\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?fit=1027%2C560&amp;ssl=1\" data-orig-size=\"1027,560\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Pike, Rebekah&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1716387580&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"5.29-KDUP-Campus-Way-Closure\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?fit=770%2C420&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?resize=770%2C420&#038;ssl=1\" alt=\"A map showing a road and sidewalk closure on SW Campus Way between SW 26th St. and SW Memorial Place. The south entrance to Kelley Engineering Center is marked as closed. The north sidewalk is marked as closed. The south sidewalk is marked as open for pedestrians. \" class=\"wp-image-7761\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?resize=1024%2C558&amp;ssl=1 1024w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?resize=300%2C164&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?resize=768%2C419&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Closure.jpg?w=1027&amp;ssl=1 1027w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n\n\n\n<p>The north sidewalk and both bicycle lanes in this section of Campus Way will be closed during this time period. The south sidewalk will remain open for pedestrians. A bicycle detour will be provided.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"523\" data-attachment-id=\"7762\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2024\/05\/22\/5-29-6-10-campus-way-closed-between-26th-street-memorial-place\/5-29-kdup-campus-way-bike-detour\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?fit=768%2C523&amp;ssl=1\" data-orig-size=\"768,523\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Pike, Rebekah&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1716387661&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"5.29-KDUP-Campus-Way-Bike-Detour\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?fit=768%2C523&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?resize=768%2C523&#038;ssl=1\" alt=\"A map showing a bicycle detour along 26th St. to the walkway on the south side of Milam Hall to Memorial Place. \" class=\"wp-image-7762\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?w=768&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2024\/05\/5.29-KDUP-Campus-Way-Bike-Detour.jpg?resize=300%2C204&amp;ssl=1 300w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Construction Manager <a href=\"mailto:Fuszek,%20Justin%20Lang%20%3cJustin.Fuszek@oregonstate.edu%3e\" target=\"_blank\" rel=\"noreferrer noopener\">Justin Fuszek<\/a> at (541) 740-5260.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the Kelley District Utility Plant project, SW Campus Way between SW 26th St. and SW Memorial Place will be closed starting Wednesday, May 29 through Monday, June 10. \u00a0The closure is necessary to allow for crane activity related to the project. Unlike recent, intermittent closures related to the project, this will be&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2024\/05\/22\/5-29-6-10-campus-way-closed-between-26th-street-memorial-place\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":13074,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1291510,211870,1291509,656006,211864,211853],"tags":[],"class_list":["post-7760","post","type-post","status-publish","format-standard","hentry","category-bike-lane-closure","category-building-entryexit-closure","category-crane-activity","category-kelley-engineering-center","category-sidewalk-closure","category-streetroadway-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/7760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/13074"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=7760"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/7760\/revisions"}],"predecessor-version":[{"id":7763,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/7760\/revisions\/7763"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=7760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=7760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=7760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}